26
NRG 1x-60 - Installation & Operating Manual -
819681-00
Preparing for installation
Screw the level electrode and electrode extension together
NRG 16-60, NRG 17-60, NRG 19-60, NRG 111-60
5.
Following a visual inspection, firmly screw the
electrode extension into the electrode tip
K
.
6.
While doing this, push the retaining spring
L
onto the electrode extension
M
until it is
securely held in the hole provided.
Use an open-ended spanner (size 13) to firmly
hold the electrode during this work.
If necessary (e.g. for low conductivity of
around 0.5 μS/cm), you can fit the optional
measuring surface extension
N
.
7.
Push the measuring surface extension
N
onto
the electrode extension
M
.
Make sure the electrode extension
M
protrudes from the underside by at
least 2 mm.
8.
Using an Allen key, secure the measuring
surface extension.
9.
Push the supplied lock washer
O
over the
electrode extension
M
from below and press
it against the measuring surface extension.
K
3 mm A.F.
Hole for retaining
spring
M
L
N
2 mm
Fig. 11
13 mm A.F.
O