![Genie Z-60/34 Скачать руководство пользователя страница 53](http://html1.mh-extra.com/html/genie/z-60-34/z-60-34_service-manual_2211981053.webp)
Part No. 75861
Genie Z-60/34
3 - 31
November 2003
Section 3 • Scheduled Maintenance Procedures
REV A
6 Continue at full speed and note the time when
the machine reference point crosses the finish
line.
7 Press down the foot switch and lower the boom
to the stowed position.
8 Extend the boom 1 foot / 30 cm.
9 Choose a point on the machine; i.e., contact
patch of a tire, as a visual reference for use
when crossing the start and finish lines.
10 Bring the machine to top drive speed before
reaching the start line. Begin timing when your
reference point on the machine crosses the
start line.
11 Continue at top speed and note the time when
the machine reference point crosses the finish
line. Refer to Section 2, Specifications.
B-19
Test the Alarm Package
(if equipped)
The alarm package includes:
· Travel alarm
· Descent alarm
· Flashing beacons
Alarms and beacons are installed to alert operators
and ground personnel of machine proximity and
motion. The alarm package is installed on the
turntable rear cover. Beacons are installed on both
turntable covers.
The alarms and beacons will
operate with the engine
running or not running.
1 Turn the key switch to ground controls and pull
out the red Emergency Stop button to the on
position at both the ground and platform
controls.
Result: Both flashing beacons should be on and
flashing.
2 Hold the function enable switch to either side
and activate the boom toggle switch in the down
position, hold for a moment and then release it.
Result: The descent alarm should sound when
the toggle switch is held down.
CHECKLIST
B
PROCEDURES
Содержание Z-60/34
Страница 1: ...Part No 75861 November 2003 Rev A Service Manual Refer to inside cover for serial number information ...
Страница 12: ...Genie Z 60 34 Part No 75861 November 2003 This page intentionally left blank ...
Страница 154: ...5 18 GenieZ 60 34 PartNo 75861 November 2003 Section 5 Fault Codes This page intentionally left blank ...
Страница 157: ......
Страница 160: ...Electrical Schematic Deutz F4L 1011F Models November 2003 Section 6 Schematics ...
Страница 162: ...Ground Control Box Wiring Diagram Deutz F4L 1011F Models November 2003 Section 6 Schematics ...
Страница 164: ...Platform Control Box Wiring Diagram Deutz F4L 1011F Models November 2003 Section 6 Schematics ...
Страница 165: ......
Страница 168: ...Electrical Schematic Ford LRG 425 EFI Models November 2003 Section 6 Schematics ...
Страница 170: ...Ground Control Box Wiring Diagram Ford LRG 425 EFI Models November 2003 Section 6 Schematics ...
Страница 172: ...Platform Control Box Wiring Diagram Ford LRG 425 EFI Models November 2003 Section 6 Schematics ...
Страница 173: ...November2003 Section 6 Schematics PartNo 75861 GenieZ 60 34 6 11 ...
Страница 176: ...Hydraulic Schematic 2WD Models before serial number 4461 November 2003 Section 6 Schematics ...
Страница 178: ...Hydraulic Schematic 4WD Models before serial number 4461 November 2003 Section 6 Schematics ...
Страница 180: ...Hydraulic Schematic 2WD Models after serial number 4460 November 2003 Section 6 Schematics ...
Страница 182: ...Hydraulic Schematic 4WD Models after serial number 4460 November 2003 Section 6 Schematics ...