www.geniecompany.com
01-14
4.1
The Rolling Steel Door Operator can be assembled for
right-hand
or
left-hand
(Each model can also be
Section 4: Installation
Rolling Steel Doors
Front of Hood Installation
1) Remove wall mount brackets from operator. Attach rolling steel mounting
brackets to the operator using the fasteners provided.
Figure 1.
Figure 1
NOTE:
On Jackshaft units, release cable must be installed on operator
before unit is installed.
mounting
Front of Hood.
wall mounted.) Typical mounting arrangements are shown.
2) Attach Operator to Powerhead Support bracket using the fasteners
provided. Figure 2.
5/16-18 X 3/4 CARRIAGE BOLT
& 5/16-18 FLANGE NUT
(QTY 6 EACH)
ROLLING STEEL
MOUNTING BRACKETS
Figure 2
5/16-18 X 1-1/4
CARRIAGE BOLT
(QTY 4 EACH)
USE THIS SET
OF HOLES
5/16-18 FLANGE NUT
(QTY 4 EACH)
USE THIS SET
OF HOLES
POWER HEAD SUPPORT
BRACKET
Содержание GCL-J&H 1/2HP
Страница 2: ...THIS PAGE LEFT BLANK...
Страница 66: ...THIS PAGE LEFT BLANK...
Страница 67: ...THIS PAGE LEFT BLANK...
Страница 68: ...1 Door Drive Mt Hope Ohio 44660 www geniecompany com 1 1 1 8 4 5 5 0 2 3 5 1...