Working Platform
Assembly and Operating Manual
Page 21 of 52
BL 061 U Edition 06.2007
Roof extension DA (2)
Assemble like DA (1);
•
Secure additional brace [130] above
on front beam and on stop bracket
[100] and secure.
•
Secure stop bracket vertically on the
front beam and secure with two pins
[60].
•
Unscrew the anchoring lock on the
bracing
rope
until
the
entire
tensioning length is available.
60
10
20
30
40
50
100
DA 2
130
120
110
L1
L2
(Number of necessary locking pins = 11)
•
Pull bracing rope through between stop bracket and locking
pin and secure on brace [130] with locking pins [60].
•
Secure rope socket [110] to counterweight carrier [50] and
tension it using the anchoring lock until the locking pin can
only be moved with difficulty.
Fig. 10 Roof extension DA 2
Roof extension DA (3)
Only possible with AB 450 winch
Assemble like DA (1);
•
However,
before
securing
the
connecting piece push the support
carrier onto the beam in front [10]
and secure with two pins. This
structure is only permitted with
outreach (L1) = 0.6 m. The position
of the support carrier or the
attachment support determines this
outreach.
(Number of necessary locking pins = 8)
Fig. 11 Roof extension DA 3
110
50
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60
130
60