Roof extension DA (4)
Assemble the beam
like DA (1 and 3);
Assemble the brace
like DA (2).
(Number of necessary locking pins = 12)
Fig. 12 Roof extension DA 4
Roof extension DA (5) (only possible with AB 450 winch)
•
Assemble
the
beam
like
DA (1 and 3)
•
However, the A-support [80] is
assembled between the support
carrier [70] and the beam in front; it
is secured above and below by two
locking pints [60] each.
•
The support [90] is assembled
between the counterweight support
and the beam behind and is secured
with two locking pins.
DA 5
10
20
30
40
50
60
70
80
90
L1
L2
Bild 7:
(Number of necessary locking pins = 11)
Fig. 13 Roof extension DA 5
Roof extension DA (6)
Assemble the beam like DA (5);
Assemble the brace like DA (2);
L2
min
= 2.6m
DA 6
10
20
30
40
50
90
60
80
70
100
120
110
130
L1
L2
Bild 8:
(Number of necessary locking pins = 15)
Fig. 14 Roof extension DA 6
9.1.3
Aligning the roof extension
Align the roof extensions in such a way that their distance agrees with the C-clamp distance to the
working platform. Hoisting on a slant is not permitted.
9.1.4
Stability calculation for the roof extension
The stability calculation includes determining the number of counterweights according to Table 1 and
Table 3 as well as identifying the bearing capacity for the roof construction at the place where the roof
extension is to be set up according to Table 1 and Table 3. The bearing capacity for the roof
construction is to be identified for each individual load scheme.