Operation
300 Z/ZP 2
50
BL144 GB 2019-11
Front platform access points
The ramp (1) can also be installed on the front of the platform using
additional parts (2).
If the front ramp (2) is also installed, the load capacity of the
platform is reduced by approx. 55 kg.
Fig. 21: Platform with front ramp
Only one ramp can be operated at any time!