300 Z/ZP 2
Operation
BL144 GB 2019-11
41
4.3
Operation/function
Fig. 9: Overview
1
Cable guide
2
Mast section
3
Platform access, ground station
(ramp/door)
4
Cable bin
5
Base mast with foot section
6
Base enclosure
7
Underrun protection
8
Building platform access (barrier
with loading ramp)
9
Roof
10 Mast tie
11 "Comfort" landing level safety
gate
12 "VARIO" landing level safety gate