300 Z/ZP 2
Operation
BL144 GB 2019-11
49
4.3.2
Platform access at the ground station
This access point to the platform can only be opened if the platform is
stopped by the down limit switch at the ground station.
4.3.2.1
Loading door / Ramp
Opening
Push/pull the loading door/ramp (1) inwards with one hand.
Lift/lower the interlock hook (2).
Open the loading door or carefully lower the ramp.
Fig. 20: Locking the loading door/ramp
Closing
Close the loading door/ramp (1) and push/pull inwards until the
interlock hook (2) engages.