Switch all of the solenoid valves off again one after the other in the order
Y1, Y2 and Y3 (if fitted): use a screwdriver to turn the screw (S) in
direction 0.
Fig.42
Fig.43
®
Further information about Y1/Y2/Y3: seeSection 6.3, Page 41.
3.
Switch on the power supply.
4.
Press the relevant buttons to switch to programming mode, see .
®
While the programming routine runs automatically, the solenoid valves in
the control top are activated and deactivated, which causes the process
valve to automatically move to the positions in succession. During this
period, the illuminated dome is continuously lit red. After completion of end
position programming, the colours in the illuminated dome change
cyclically.
®
In deviation from the factory setting you can select switching point
tolerances, attenuations and the LEFF function (only if the valve is LEFF
compatible, i.e. double-seat valve with lifting actuator), see .
®
If 24/7 PMO valves (types M_O (06), M/2.0, MT/T_T (08) are used in
conjunction with the control top T.VIS A-15, the factory settings in the
control top may not be changed.
®
If no selection is made within 30 seconds, the setting last selected is
automatically adopted and visualized in accordance with the colours
selected.
®
The control top is activated.
Checking the Control Top
Once the control top has been properly mounted on the valve and the electrical
connections have been established correctly, commissioning can be carried out.
Carry out the following steps:
1.
Activate the solenoid valves in succession via the PLC in order to check the
proper function of the T.VIS feedback signals.
®
This completes commissioning.
Start-up
Commissioning – Control Top with Solenoid Valves
430BAL010699EN_6
17.03.2022
69
Содержание T.VIS A-15
Страница 6: ...430BAL010699EN_6 6 17 03 2022...
Страница 108: ...14 Spare parts list Switch bar T VIS A 15 Fig 77 Spare parts list Switch bar T VIS A 15 430BAL010699EN_6 108 17 03 2022...
Страница 116: ......