9.6.5 Mounting the control top
Tools
●
Hex socket key
1.
Place the control top (B) onto the
switch bar (1) and installation base
from above.
2.
Mount the half-rings (B12) on the
control top (B).
®
Ensure that the half-rings are
mounted correctly!
Observe torques, see
1
B12
B
B11
B12
B11
198
Þ
Control top is fitted.
9.6.6 Mounting the clamp connection between the housing and
lantern
Mounting the clamp connection depends on how the valve is configured:
●
Spring-to-close valve (NC) with control head T.VIS
●
Spring-to-close valve (NC) without control head T.VIS
●
Spring-to-open valve (NO) with control head T.VIS
●
Spring-to-open valve (NO) without control head T.VIS
70 / 106 - 9.6 Installing the valve
0000000576 - 001 - EN-GB
Содержание ECOVENT N ECO Series
Страница 6: ...6 106 Table of Contents 0000000576 001 EN GB...
Страница 9: ...1 4 Declarations of conformity 1 4 Declarations of conformity 9 106...
Страница 12: ...12 106 1 4 Declarations of conformity 0000000576 001 EN GB...
Страница 20: ...20 106 2 10 Emergency measures 0000000576 001 EN GB...
Страница 38: ...38 106 5 6 Electrical connection with T VIS control top 0000000576 001 EN GB...
Страница 42: ...42 106 7 2 Shutdown 0000000576 001 EN GB...
Страница 82: ...82 106 9 7 Maintenance 0000000576 001 EN GB...
Страница 84: ...84 106 9 7 Maintenance 0000000576 001 EN GB...
Страница 98: ...98 106 12 2 Spare parts lists 0000000576 001 EN GB...
Страница 103: ...2 20 10 2022 221MBL003579DE_4 13 2 Dimensions sheet Actuator ECO E 103 106...