5 Assembly and installation
This chapter contains information and instructions about the assembly and installation
of the valve.
It is addressed to all persons who carry out actions related to the valve.
INFO
During assembly and installation, observe chapter
ing Instructions.
5.1 Notes on installation
The valve can be installed in any position. Steps must be taken to ensure that the valve
housing and the pipe system can drain properly.
If the valve is installed in the horizontal position, pay attention that the vent hole in the
actuator is aligned horizontally on one side.
To avoid damage, ensure that the valve is installed into the pipe system without tension
and no objects remain in the system after assembly (e.g. tools, screws, lubrication oils).
If the valve is installed horizontally, the stress on the valve stem seals is higher than in
the vertical installation position. Therefore, support the actuator and regularly check
the valve for leakage.
5.2 Control top
If the external valves are connected in a control top with several solenoid valves, make
sure that the control air pressure in the main actuator does not fall below the operating
pressure.
5.3 Install the valve with detachable pipe connection
elements
Prerequisites
●
The pipe is drained, and cleaned or rinsed, if necessary.
●
The pipe section for the valve to be mounted must be separated from the re-
maining pipe system.
1.
Fit valves with detachable pipe connection elements – using suitable connection
fittings – directly into the pipe system.
Þ
Valve is installed.
5.4 Install valve with welding ends
WARNING
Spring tension in the valve (NC)
Danger of injury when opening the clamp connections on the actuator or on the
housing as the released spring pretension will suddenly lift the actuator.
●
Therefore, release the spring tension before detaching the clamp connection by
pressurising the actuator with compressed air at max. 8 bar.
5.1 Notes on installation - 33 / 106
Содержание ECOVENT N ECO Series
Страница 6: ...6 106 Table of Contents 0000000576 001 EN GB...
Страница 9: ...1 4 Declarations of conformity 1 4 Declarations of conformity 9 106...
Страница 12: ...12 106 1 4 Declarations of conformity 0000000576 001 EN GB...
Страница 20: ...20 106 2 10 Emergency measures 0000000576 001 EN GB...
Страница 38: ...38 106 5 6 Electrical connection with T VIS control top 0000000576 001 EN GB...
Страница 42: ...42 106 7 2 Shutdown 0000000576 001 EN GB...
Страница 82: ...82 106 9 7 Maintenance 0000000576 001 EN GB...
Страница 84: ...84 106 9 7 Maintenance 0000000576 001 EN GB...
Страница 98: ...98 106 12 2 Spare parts lists 0000000576 001 EN GB...
Страница 103: ...2 20 10 2022 221MBL003579DE_4 13 2 Dimensions sheet Actuator ECO E 103 106...