1 Overview......................................................................................................................................191
2 System Startup and Shutdown....................................................................................................192
2.2.1 Logon window............................................................................................................192
2.2.2 Log On ......................................................................................................................194
2.2.3 Log Off.......................................................................................................................194
2.3.1 Routine daily start up when the system was not shut down...................................... 195
2.3.2 Routine daily start up from system shutdown............................................................195
2.3.3 Start up from power off.............................................................................................. 196
2.3.4 System start up failures ............................................................................................ 196
2.4.1 Considerations...........................................................................................................196
2.4.2 Shutdown process..................................................................................................... 196
2.4.3 Restart process..........................................................................................................197
3.3 Daily QA workflow.............................................................................................................. 199
3.4 Tube Warmup ...................................................................................................................199
3.5 Run Fast Calibrations.........................................................................................................202
Revolution CT User Manual
Direction 5480385-1EN, Revision 1
12
Table of Contents
Содержание Revolution CT
Страница 1: ...Revolution CT User Manual OPERATING DOCUMENTATION 5480385 1EN Revision 1 ...
Страница 2: ...This page left intentionally blank Revolution CT User Manual Direction 5480385 1EN Revision 1 2 ...
Страница 216: ...Revolution CT User Manual Direction 5480385 1EN Revision 1 This page left intentionally blank 216 2 Patient Schedule ...
Страница 370: ...Revolution CT User Manual Direction 5480385 1EN Revision 1 This page left intentionally blank 370 7 SnapShot Freeze ...
Страница 440: ...Revolution CT User Manual Direction 5480385 1EN Revision 1 This page left intentionally blank 440 4 Exam Split ...
Страница 471: ...Illustration 18 VR Settings screen Revolution CT User Manual Direction 5480385 1EN Revision 1 Chapter 16 Reformat 471 ...
Страница 502: ...Revolution CT User Manual Direction 5480385 1EN Revision 1 This page left intentionally blank 502 7 Batch Film ...
Страница 674: ...Revolution CT User Manual Direction 5480385 1EN Revision 1 This page left intentionally blank 674 1 Operator Messages ...
Страница 680: ...Revolution CT User Manual Direction 5480385 1EN Revision 1 This page left intentionally blank 680 1 Units of Measure ...
Страница 688: ...Revolution CT User Manual Direction 5480385 1EN Revision 1 This page left intentionally blank 688 1 Lexicon ...
Страница 692: ...Illustration 2 GE XXL Revolution CT User Manual Direction 5480385 1EN Revision 1 692 1 Auto Gating Profiles ...
Страница 694: ...Illustration 4 GE Gen CardioVasc Revolution CT User Manual Direction 5480385 1EN Revision 1 694 1 Auto Gating Profiles ...
Страница 696: ...Illustration 6 GE CACS Revolution CT User Manual Direction 5480385 1EN Revision 1 696 1 Auto Gating Profiles ...
Страница 701: ...Revolution CT User Manual Direction 5480385 1EN Revision 1 This page left intentionally blank 701 ...