![GE ReadyToProcess WAVE 25 Скачать руководство пользователя страница 89](http://html.mh-extra.com/html/ge/readytoprocess-wave-25/readytoprocess-wave-25_operating-instructions-manual_128043089.webp)
Action
Step
Cut the Tygon tubing into pieces of appropriate length, one piece for con-
necting gas distribution from the CBCU to the Cellbag bioreactor and as
many pieces as required for connecting the gas mix sources to the CBCU.
1
Insert a CPC™ tubing connector into one end of each piece.
2
For the tubing used to connect the CBCU to the Cellbag bioreactor, connect
the end without the CPC connector to the silicone tubing using the supplied
reducer connector.
3
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD
89
4 Installation
4.2 Hardware installation
4.2.2 Connect the system components
Содержание ReadyToProcess WAVE 25
Страница 1: ...ReadyToProcess WAVE 25 Operating Instructions Original instructions ...
Страница 2: ...Page intentionally left blank ...
Страница 171: ...Page intentionally left blank ...