![GE ReadyToProcess WAVE 25 Скачать руководство пользователя страница 119](http://html.mh-extra.com/html/ge/readytoprocess-wave-25/readytoprocess-wave-25_operating-instructions-manual_128043119.webp)
5.1.6
Connect gas to the system
Gas mix
The Cellbag bioreactor requires gas flow to stay inflated and to provide ventilation. The
CBCU enables different gas mixing possibilities. Compressed air or N
2
can be mixed with
CO
2
and/or O
2
to obtain the desired gas mix.
Compressed air or N
2
is connected to AIR/N2 on the CBCU. CO
2
and O
2
are connected
to CO2 IN and O2 IN, respectively, on the CBCU rear panel.
NOTICE
In dual mode, be careful to connect the air and gas for the left and
right Cellbag bioreactors to the correct CBCU. This is easier if the
respective CBCU units are placed on the left and right sides of the
rocker respectively.
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD
119
5 Operation
5.1 Set up the system
5.1.6 Connect gas to the system
Содержание ReadyToProcess WAVE 25
Страница 1: ...ReadyToProcess WAVE 25 Operating Instructions Original instructions ...
Страница 2: ...Page intentionally left blank ...
Страница 171: ...Page intentionally left blank ...