![GE ReadyToProcess WAVE 25 Скачать руководство пользователя страница 121](http://html.mh-extra.com/html/ge/readytoprocess-wave-25/readytoprocess-wave-25_operating-instructions-manual_128043121.webp)
Action
Step
Connect tubing from the GAS MIX OUT on the CBCU front panel to the inlet
vent filter of the Cellbag bioreactor.
2
Connect the desired gas source, air or N
2
, at 1.0 to 1.5 bar to AIR/N2 on the
CBCU rear panel.
3
If applicable, connect the CO
2
gas source at 1.0 to 1.5 bar to CO2 IN on the
CBCU rear panel.
4
If applicable, connect the O
2
gas source at at 1.0 to 1.5 bar to O2 IN on the
CBCU rear panel.
5
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD
121
5 Operation
5.1 Set up the system
5.1.6 Connect gas to the system
Содержание ReadyToProcess WAVE 25
Страница 1: ...ReadyToProcess WAVE 25 Operating Instructions Original instructions ...
Страница 2: ...Page intentionally left blank ...
Страница 171: ...Page intentionally left blank ...