![GE ReadyToProcess WAVE 25 Скачать руководство пользователя страница 111](http://html.mh-extra.com/html/ge/readytoprocess-wave-25/readytoprocess-wave-25_operating-instructions-manual_128043111.webp)
Action
Step
Place the Cellbag bioreactor on the tray with the optical sensors facing
downwards.
5
NOTICE
Make sure that the optical fiber cables are not placed
between the Cellbag bioreactor and the temperature
sensor on the tray. This could lead to erroneous tem-
perature reading and control, resulting in overheating.
To keep track of the optical fiber cables, mark the cables with the supplied
stickers.
6
Bundle the optical fiber cables on one side of the tray. Fit the lid and make
sure the tubing and cables are placed in the tubing exit. See Illustrations of
tray and lid, on page 47.
7
Connect the pH sensor cable to the pH port on the CBCU front panel.
8
Connect the DO sensor cable to the DO port on the CBCU front panel.
9
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD
111
5 Operation
5.1 Set up the system
5.1.3 Prepare pH and DO sensors
Содержание ReadyToProcess WAVE 25
Страница 1: ...ReadyToProcess WAVE 25 Operating Instructions Original instructions ...
Страница 2: ...Page intentionally left blank ...
Страница 171: ...Page intentionally left blank ...