GE H
EALTHCARE
D
IRECTION
5394152,
Revision 5
LOGIQ™ P6/P6 P
RO
S
ERVICE
M
ANUAL
Page 8-96
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
4.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-44-4
Mounting Procedure
Install the new parts in the reverse order of removal.
Table 8-45 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test
Debrief Script
“Service Manual, Direction
5394152, Rev 1+, Section 8-2-44. Equipment
passed all required tests and is ready for use. “
ACPC II Assy set Function Validation
Outlet Test - Wiring Arrangement - USA &
Isolated Patient Lead (Source) Leakage–Lead