GE H
EALTHCARE
D
IRECTION
5394152,
Revision 5
LOGIQ™ P6/P6 P
RO
S
ERVICE
M
ANUAL
Page 8-92
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
5.) Disconnect three (3) USB connectors or 5 USB connectors from the rear panel and 2 AC power
connector. The 4D controller USB and ECG USB connector also connect to this rear panel PWA.
6.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-42-4
Mounting Procedure
Install the new parts in the reverse order of removal.
Figure 8-135 Open Rear Panel
Table 8-43 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test
Debrief Script
“Service Manual, Direction
5394152, Rev 1+, Section 8-2-42. Equipment
passed all required tests and is ready for use. “
ARPII Assy Function Validation Procedure