NOTE:
MEDRAD Avanta Table mount: A 76.2 mm (3 in) and max 25 m (984 in) length conduit
between technical room and patient room shall be prepared below the floor for the three
injector cables. It is recommended to use the MEDRAD Avanta floor mounting bracket
to cover the duct hole in the patient room if there is no gases box.
Floor mount installation can be accomplished one of two ways:
•
Connectors mounted in trough under mounting bracket (Figure 1)
•
Connectors mounted above mounting bracket (Figure 2)
Illustration 6-17: MEDRAD Avanta floor mounting methods
For further MEDRAD Avanta floor mounting, see the Installation guide
MEDRAD
Avanta Floor Mounting Bracket.
Innova 2121-IQ/3131-IQ Biplane Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare
Direction 5177951-4-1EN, Revision 1
178
17 Cable Channeling
Содержание Innova 2121-IQ Biplane
Страница 251: ......