2. Position the lift rail and the cable carrier channel so that the plastic boss is past the metal stop block and
the coil springs have a slight tension. Slide the channel and lift rail together so that the last tensioning roller
is just entering the upright. Align the screws with the holes. Slide the assembly back into the upright. Using
a 3mm hex key, reinstall the side roller bracket. To make sure it is properly seated in its tracks, move the rail
assembly through its full range of travel to make sure it does not hang-up or bind before reattaching the
upright to the unit.
3. To assist in reattaching the upright to the unit, there are four studs on the bracket casting that mate with
four holes in the upright. Place the upright on the studs. Be sure the radiant heater bracket is in front of the
upright. Be careful not to pinch any wires between the unit and the upright.
4. Secure the upright to the unit by reinstalling the 2 screws in the holes inside the upright. Pull any excess
wiring slack in the upright channels into the electrical enclosure.
5. Push the lift rail down into the upright until the rail locking screws align with the horizontal oblong holes in
the rail. Lock the rail by turning the screws CCW (4 mm hex key) until they lock the inner rail in place.
6. Attach ground wire to rail. Fasten the display module to the upright with the two screws and nut bar
removed earlier.
7. Reinstall the wire cover. Take care to route the wires in the upright channels and not to pinch them with the
cover when securing with the screw.
8. Reinstall the front bezel of the display module and secure with the 4 standoffs and lock washers. Push the
control knob back onto its shaft.
9. Fasten the back panel to the display module with its 4 mounting screws.
10. Reinstall the decorative strip and the two end caps.
11. Fasten the controller cover to the back of the enclosure.
12. Attach the canopy bracket to the lift rail with the 2 screws removed earlier.
13. Reconnect the 2 electrical connectors for the radiant heater.
14. Reinstall the left inside cover around the electrical cables with the 2 nuts and screws removed earlier.
15. Reinstall the heater housing cover and canopy soffit.
16. Release the intermediate rail locks by tightening the set screws so that the screw heads disengage from
the horizontal oblong holes in the uprights.
© 2001 by Datex-Ohmeda, Inc.. All rights reserved.
6600-0343-000 104
105
Chapter 5: Repair Procedures
Содержание Giraffe OmniBed
Страница 10: ...x 6600 0343 000 104 2001 by Datex Ohmeda Inc All rights reserved Table of Contents ...
Страница 28: ...xxviii 6600 0343 000 104 2001 by Datex Ohmeda Inc All rights reserved About this Manual ...
Страница 38: ...10 6600 0343 000 104 2001 by Datex Ohmeda Inc All rights reserved Chapter 1 Functional Description ...
Страница 48: ...20 6600 0343 000 104 2001 by Datex Ohmeda Inc All rights reserved Chapter 2 Service Checkout ...
Страница 56: ...28 6600 0343 000 104 2001 by Datex Ohmeda Inc All rights reserved Chapter 3 Calibration and Maintenance ...
Страница 260: ...232 6600 0343 000 104 2001 by Datex Ohmeda Inc All rights reserved Chapter 6 Illustrated Parts ...