64
I N S TA L L AT I O N , O P ER AT I O N S A N D M A I N T EN A N C E M A N UA L
Apply a coat of good acrylic enamel primer
(Sherman-Williams E61 A 60, part number
21525025200) with a viscosity of approximately
24-32 seconds using a #2 Zahn cup. Reduce with
D5B9 Xylol (part number 21525038000) if needed.
Air dry the primer for a minimum of 30 minutes,
then apply the finish color coat of acrylic enamel.
The top coat should be applied within 24 hours for
best adhesion. If the area is to be spray-coated,
thin the acrylic enamel with D5B9 Xylol (part
number 21525038000). This thinning should only
be necessary if the paint was received in a five
gallon drum or more.
The recommended viscosity for the W42713
topcoat should be 24-32 seconds with a #2 Zahn
cup. The curing schedule for PPG W42713 is dust
free in 5 minutes, touch in 30 minutes, handle in
60 minutes, full cure in 7 days.
Both the primer (Sherwin-Williams E61 A 60) and
paint (PPG W42713) should be applied only when
temperature is above 55 degrees Fahrenheit.
Application of special paint will be per the
manufacturer’s Product Data Sheet which includes
instructions on thinning and application.
Circuit breaker lifting mechanism
Under normal conditions, no special
maintenance procedures or lubrication is required
for this device. If the cable is abraided under any
condition, it should be inspected for broken
strands or other damage and replaced if necessary.
Circuit breaker fan compartments
It is recommended that periodic checks be
performed on the fan circuits to ensure proper
functionality.
Please see
1VAL106902-TG.