GE
Direction 5370626-100, Revision 18 LOGIQ e/LOGIQ e Vet/LOGIQ i/Vivid e Basic Service Manual
Chapter 7 Diagnostics/Troubleshooting
7-27
Insite II Configuration (For LOGIQ e R6.x.x/R7.x.x and LOGIQ e Vet R6.x.x/
6.) Press power switch, select Full Maintenance Reboot
7.) In remote server side, select the device type in DEVICE TYPE.
Figure 7-32 Full Maintenance Reboot window
Figure 7-33 device type window