Auto Heat disinfection
Auto Heat can be used with or without CleanCart. If the Auto Heat
shall be performed with CleanCart must the cartridge be installed
before the Auto Heat starts.
AK 95 S
Disinfection programs
Total Time [min]
230 V
110 V
100 V
With
UFD
installed
Heat
31
35
45
Heat CleanCart
43
49
58
Without
UFD
Heat
31
35
45
Heat CleanCart
43
48
58
Temperature:
+93 °C (measured after heating rod)
≥
80
°C (measured in the outlet before the heat
exchanger)
Note:
The temperatures are veri
fi
ed at nominal values for the mains
voltage and at 20 °C ambient temperature.
Rinse/Drain:
Rinse/Drain
10 minutes
Drain
4 minutes
Exterior cleaning:
All outside parts of the machine can
be cleaned with ethanol (70%) or
isopropanol (60%).
Note:
Total Time for Disinfection Programs are estimated and may
vary.
Water supply
Flow rate:
During treatment: maximum 770
ml/minDuring disinfection and
rinse/drain: a maximum
fl
ow rate of 800
ml/min is required.
Minimum inlet pressure:
0.12 MPa (1.2 bar)
Maximum inlet pressure:
0.6 MPa (6 bar)
Inlet temperature:
Treatment: +5 to +30 ºC Disinfection:
+5 to +90 ºC
Connector in/outlet:
Diameter 8 mm
Quality:
Inlet water quality must comply with
local regulations and if no such regulation
is available follow ISO 13959. Level
for conductivity shall not exceed 0.1
mS/cm. It is possible to use water with
higher conductivity if it consists mainly
of sodium salts. This may however affect
the accuracy of the
fl
uid composition.
H CEN9369 Revision.10.2005
Program version 12.xx
AK 95 S
Service
m anual - Technical data and spec i
fi
cations
3
:7
Содержание AK 95
Страница 1: ...AK 95 AK 95 S Service Manual A better way to better care ...
Страница 5: ...This page is intentionally left blank ...
Страница 6: ...Installation Guide AK 95 AK 95 S January 2004 ...
Страница 7: ......
Страница 17: ...AK 95 AK 95 S Service Manual HCEN9133Rev 01 2004 1 10 Installation Guide This page is intentionally left blank ...
Страница 19: ...AK 95 AK 95 S Service Manual HCEN9133Rev 01 2004 1 12 Installation Guide This page is intentionally left blank ...
Страница 20: ......
Страница 64: ...Technical Data AK 95 HCEN9135 Rev 10 2005 3 1 Chapter 3 Technical data and specifications for AK 95 ...
Страница 102: ...Maintenance Manual AK 95 AK 95 S October 2006 GAMBRO ...
Страница 103: ......
Страница 125: ...5 22 MaintenanceManual AK95 AK95SHCEN12189Rev 10 2006 This page is intentionally left blank ...
Страница 126: ......
Страница 151: ...AK 95 AK 95 S Service Manual HCEN9138Rev 10 2005 6 24 Calibrations This page is intentionally left blank ...
Страница 152: ...Spare Parts List AK 95 AK 95 S October 2005 ...
Страница 153: ......
Страница 159: ...HCEN9094Rev 10 2005 7 3 Operator s panel 9 1 3 4 5 6 5 7 5 2 8 6 6 8 ...
Страница 161: ...HCEN9094Rev 10 2005 7 4 Blood pump 10 2 8 3 5 9 4 7 1 6 11 12 ...
Страница 163: ...HCEN9094Rev 10 2005 7 5 Blood pump Motor unit 8 7 6 9 2 10 3 4 5 1 11 ...
Страница 165: ...HCEN9094Rev 10 2005 7 6 Heparin pump 1 2 3 4 5 6 8 7 ...
Страница 169: ...HCEN9094Rev 10 2005 7 8 Magnetic Clamp unit 1 2 3 7 8 12 16 4 5 6 9 10 11 17 18 14 13 19 15 ...
Страница 173: ...HCEN9094Rev 10 2005 7 10 UF measuring unit 8 10 14 17 7 11 9 4 13 16 2 15 1 3 6 9 12 18 20 19 21 ...
Страница 181: ...HCEN9094Rev 10 2005 7 13 Heater Flow guard 3 9 1 2 10 4 8 7 11 12 13 5 6 3 ...
Страница 187: ...HCEN9094Rev 10 2005 7 16 Variable flow unit to Step driver board 2 2 4 5 3 1 8 7 4 11 6 9 10 13 14 15 12 ...
Страница 189: ...HCEN9094Rev 10 2005 Protective Protective 7 17 Boards 7 1 2 9 6 5 4 3 8 ...
Страница 191: ...HCEN9094Rev 10 2005 1 7 18 Rear box 6 3 7 5 4 2 ...
Страница 193: ...HCEN9094Rev 10 2005 7 19 Protective Covers 3 5 4 2 7 1 6 8 The figures do not correspond to their actual sizes ...
Страница 195: ...HCEN9094Rev 10 2005 T12AH 250AC BACH BACO HALT 7 20 AC DC 2 4 5 1 6 7 8 9 3 ...
Страница 203: ...HCEN9094Rev 10 2005 7 24 Front MM95 18 8 4 8 5 7 20 15 14 6 2 11 21 19 10 9 12 15 3 17 15 13 13 16 14 17 12 1 ...
Страница 205: ...HCEN9094Rev 10 2005 7 25 MM I O board 3 2 9 4 6 7 8 5 1 10 ...
Страница 207: ...HCEN9094Rev 10 2005 7 26 Feeding pumps 15 18 14 16 10 7 10 19 2 6 3 4 17 5 7 12 20 13 9 11 14 18 8 ...
Страница 215: ...HCEN9094Rev 10 2005 7 30 UFD Option 4 5 7 17 12 9 6 18 1 6 11 16 8 10 6 13 14 3 2 6 19 15 ...
Страница 217: ...HCEN9094Rev 10 2005 7 31 Remote panel Option 18 6 7 8 12 7 14 15 16 17 13 11 10 9 5 4 3 2 1 22 23 24 25 26 19 20 21 ...
Страница 219: ...HCEN9094Rev 10 2005 7 32 Boards and Cablings EN1107 10 Step driver board ...
Страница 221: ...HCEN9094Rev 10 2005 7 32 Boards and Cablings EN1107 10 Step driver board ...
Страница 224: ......
Страница 225: ...9 1 HCEN9160 Revision10 2005 Service Manual Symbols Chapter9 SymbolDescription ...
Страница 228: ...9 4 HCEN9160Revision10 2005 Service Manual Symbols Thispageisleftintentionallyblank ...
Страница 229: ...AK 95 AK95SHCEN12078Rev 10 2005 10 1 Replacements Replacements Replacement matrix 2 Changeactions 4 FM Flow Diagram 5 ...
Страница 234: ...Replacements 10 6 AK 95 AK95SHCEN12078Rev 10 2005 This page is intentionally left blank ...
Страница 244: ...11 10 Electrical Safety Inspections for AK machines HCEN12190 Rev 05 2006 This page is intentionally left blank ...
Страница 247: ...AK 95 AK 95 S Service Manual ...