AK 95 / AK 95 S Service Manual
HCEN 9133 Rev. 01. 2004
Installation Guide
1:11
Checklist -
Check if applicable
Yes
Checklist
- filed by the Sevice Engi-
neer responsible for the installation.
Unpacking and inspection
Ensure that the specified equipment
has been delivered.
Check that the additional package box
contains the specified components.
Check, by visual inspection that the
machine shows no sign of damage.
Environment and Physical Data
Ensure that the Operating Environment
is according to the specifications.
Interconnection
Ensure that the monitors are intercon-
nected correctly.
Top Tray
Ensure that the top tray is placed at
the top of the machine.
Connection to the Water Supply
Ensure that the machine is correctly
connected to the Water Supply.
Ensure that the water fulfils all require-
ments set out under
Environment and
Physical Data.
Ensure that the machine is correctly
connected to the drain.
Connection to the Power Supply
Ensure that the voltage specified on the
voltage tag matches the mains voltage.
Ensure that the machine is correctly
connected to the Power Supply.
Mains power must be connected to a
grounded power socket.
Connection of the Battery
Ensure that the rechargeable 9V battery is
correctly connected according to the instruc-
tions.
Connection of the dialysis fluid tubes
Ensure that the dialysis fluid tubes are
connected to the safety couplings.
Start-up procedure
Note!
If you have any remarks during installa-
tion, please contact your
Gambro Service
representative.
This record is to be signed and filed by the Service Engineer responsible for the installation.
Date
............................
Signature
........................................................................
Serial number:
..................................
Ensure that the recommended
start-up procedure is followed.
Out of box report
Fill out the Installation / Out of
Box report and return it to:
Gambro Lundia AB
Monitor Division
Magistratsvägen 16
PO Box 10101
SE-220 10 Lund
Sweden
Содержание AK 95
Страница 1: ...AK 95 AK 95 S Service Manual A better way to better care ...
Страница 5: ...This page is intentionally left blank ...
Страница 6: ...Installation Guide AK 95 AK 95 S January 2004 ...
Страница 7: ......
Страница 17: ...AK 95 AK 95 S Service Manual HCEN9133Rev 01 2004 1 10 Installation Guide This page is intentionally left blank ...
Страница 19: ...AK 95 AK 95 S Service Manual HCEN9133Rev 01 2004 1 12 Installation Guide This page is intentionally left blank ...
Страница 20: ......
Страница 64: ...Technical Data AK 95 HCEN9135 Rev 10 2005 3 1 Chapter 3 Technical data and specifications for AK 95 ...
Страница 102: ...Maintenance Manual AK 95 AK 95 S October 2006 GAMBRO ...
Страница 103: ......
Страница 125: ...5 22 MaintenanceManual AK95 AK95SHCEN12189Rev 10 2006 This page is intentionally left blank ...
Страница 126: ......
Страница 151: ...AK 95 AK 95 S Service Manual HCEN9138Rev 10 2005 6 24 Calibrations This page is intentionally left blank ...
Страница 152: ...Spare Parts List AK 95 AK 95 S October 2005 ...
Страница 153: ......
Страница 159: ...HCEN9094Rev 10 2005 7 3 Operator s panel 9 1 3 4 5 6 5 7 5 2 8 6 6 8 ...
Страница 161: ...HCEN9094Rev 10 2005 7 4 Blood pump 10 2 8 3 5 9 4 7 1 6 11 12 ...
Страница 163: ...HCEN9094Rev 10 2005 7 5 Blood pump Motor unit 8 7 6 9 2 10 3 4 5 1 11 ...
Страница 165: ...HCEN9094Rev 10 2005 7 6 Heparin pump 1 2 3 4 5 6 8 7 ...
Страница 169: ...HCEN9094Rev 10 2005 7 8 Magnetic Clamp unit 1 2 3 7 8 12 16 4 5 6 9 10 11 17 18 14 13 19 15 ...
Страница 173: ...HCEN9094Rev 10 2005 7 10 UF measuring unit 8 10 14 17 7 11 9 4 13 16 2 15 1 3 6 9 12 18 20 19 21 ...
Страница 181: ...HCEN9094Rev 10 2005 7 13 Heater Flow guard 3 9 1 2 10 4 8 7 11 12 13 5 6 3 ...
Страница 187: ...HCEN9094Rev 10 2005 7 16 Variable flow unit to Step driver board 2 2 4 5 3 1 8 7 4 11 6 9 10 13 14 15 12 ...
Страница 189: ...HCEN9094Rev 10 2005 Protective Protective 7 17 Boards 7 1 2 9 6 5 4 3 8 ...
Страница 191: ...HCEN9094Rev 10 2005 1 7 18 Rear box 6 3 7 5 4 2 ...
Страница 193: ...HCEN9094Rev 10 2005 7 19 Protective Covers 3 5 4 2 7 1 6 8 The figures do not correspond to their actual sizes ...
Страница 195: ...HCEN9094Rev 10 2005 T12AH 250AC BACH BACO HALT 7 20 AC DC 2 4 5 1 6 7 8 9 3 ...
Страница 203: ...HCEN9094Rev 10 2005 7 24 Front MM95 18 8 4 8 5 7 20 15 14 6 2 11 21 19 10 9 12 15 3 17 15 13 13 16 14 17 12 1 ...
Страница 205: ...HCEN9094Rev 10 2005 7 25 MM I O board 3 2 9 4 6 7 8 5 1 10 ...
Страница 207: ...HCEN9094Rev 10 2005 7 26 Feeding pumps 15 18 14 16 10 7 10 19 2 6 3 4 17 5 7 12 20 13 9 11 14 18 8 ...
Страница 215: ...HCEN9094Rev 10 2005 7 30 UFD Option 4 5 7 17 12 9 6 18 1 6 11 16 8 10 6 13 14 3 2 6 19 15 ...
Страница 217: ...HCEN9094Rev 10 2005 7 31 Remote panel Option 18 6 7 8 12 7 14 15 16 17 13 11 10 9 5 4 3 2 1 22 23 24 25 26 19 20 21 ...
Страница 219: ...HCEN9094Rev 10 2005 7 32 Boards and Cablings EN1107 10 Step driver board ...
Страница 221: ...HCEN9094Rev 10 2005 7 32 Boards and Cablings EN1107 10 Step driver board ...
Страница 224: ......
Страница 225: ...9 1 HCEN9160 Revision10 2005 Service Manual Symbols Chapter9 SymbolDescription ...
Страница 228: ...9 4 HCEN9160Revision10 2005 Service Manual Symbols Thispageisleftintentionallyblank ...
Страница 229: ...AK 95 AK95SHCEN12078Rev 10 2005 10 1 Replacements Replacements Replacement matrix 2 Changeactions 4 FM Flow Diagram 5 ...
Страница 234: ...Replacements 10 6 AK 95 AK95SHCEN12078Rev 10 2005 This page is intentionally left blank ...
Страница 244: ...11 10 Electrical Safety Inspections for AK machines HCEN12190 Rev 05 2006 This page is intentionally left blank ...
Страница 247: ...AK 95 AK 95 S Service Manual ...