4:11
AK 95 / AK 95 S Service Manual
HCEN 9136 Rev. 10.2005
Service Technicians Guide
Presetable parameters in Autopriming
0
Auto priming install
Installed / Not installed
1
Auto priming fill flow
0 - 500 ml/min
This is the initial flow rate when
filling the dialyzer and blood lines.
2
Auto priming fill time
0 - 300 s
This is the time for filling the dialyzer
and blood lines completely.
3
Auto priming press build time
0 - 30 s
The venous clamp closes. This is the time for
building up the venous pressure alarm limit.
4
Auto priming press drop time
0 - 60 s
The measurement time for the pressure
drop when performing the leakage test
of the dialyzer.
5
Auto priming press drop
0 - 100 mmHg
The acceptable pressure drop when per-
forming the leakage test of the dialyzer.
6
Auto priming prim flow
0 - 500 ml/min
This is the flow rate during the priming
phase as well as during the flushing phases.
7
Auto priming prim time
0 - 600 s
This is the required time for the priming
phase.
8
Auto priming cycle time
0 - 60 s
This time specifies the opening and closing
time of the venous clamp during the priming
phase.
9
Auto priming level time
0 - 60 s
This is the time necessary to fill up the
venous drip chamber to a correct level.
10
Auto priming flush time 1
0 - 300 s
During this time, the remaining air in
the dialyzer and blood lines will be expelled.
11
Auto priming flush time 2
0 - 600 s
If a second flush is requested, select this time.
12
Auto priming venous line time
0 - 120 s
The time when the venous clamp is open.
In order to expell any air bubbles in the
venous line.
13
Auto priming FM active
Avail / Not Avail
Содержание AK 95
Страница 1: ...AK 95 AK 95 S Service Manual A better way to better care ...
Страница 5: ...This page is intentionally left blank ...
Страница 6: ...Installation Guide AK 95 AK 95 S January 2004 ...
Страница 7: ......
Страница 17: ...AK 95 AK 95 S Service Manual HCEN9133Rev 01 2004 1 10 Installation Guide This page is intentionally left blank ...
Страница 19: ...AK 95 AK 95 S Service Manual HCEN9133Rev 01 2004 1 12 Installation Guide This page is intentionally left blank ...
Страница 20: ......
Страница 64: ...Technical Data AK 95 HCEN9135 Rev 10 2005 3 1 Chapter 3 Technical data and specifications for AK 95 ...
Страница 102: ...Maintenance Manual AK 95 AK 95 S October 2006 GAMBRO ...
Страница 103: ......
Страница 125: ...5 22 MaintenanceManual AK95 AK95SHCEN12189Rev 10 2006 This page is intentionally left blank ...
Страница 126: ......
Страница 151: ...AK 95 AK 95 S Service Manual HCEN9138Rev 10 2005 6 24 Calibrations This page is intentionally left blank ...
Страница 152: ...Spare Parts List AK 95 AK 95 S October 2005 ...
Страница 153: ......
Страница 159: ...HCEN9094Rev 10 2005 7 3 Operator s panel 9 1 3 4 5 6 5 7 5 2 8 6 6 8 ...
Страница 161: ...HCEN9094Rev 10 2005 7 4 Blood pump 10 2 8 3 5 9 4 7 1 6 11 12 ...
Страница 163: ...HCEN9094Rev 10 2005 7 5 Blood pump Motor unit 8 7 6 9 2 10 3 4 5 1 11 ...
Страница 165: ...HCEN9094Rev 10 2005 7 6 Heparin pump 1 2 3 4 5 6 8 7 ...
Страница 169: ...HCEN9094Rev 10 2005 7 8 Magnetic Clamp unit 1 2 3 7 8 12 16 4 5 6 9 10 11 17 18 14 13 19 15 ...
Страница 173: ...HCEN9094Rev 10 2005 7 10 UF measuring unit 8 10 14 17 7 11 9 4 13 16 2 15 1 3 6 9 12 18 20 19 21 ...
Страница 181: ...HCEN9094Rev 10 2005 7 13 Heater Flow guard 3 9 1 2 10 4 8 7 11 12 13 5 6 3 ...
Страница 187: ...HCEN9094Rev 10 2005 7 16 Variable flow unit to Step driver board 2 2 4 5 3 1 8 7 4 11 6 9 10 13 14 15 12 ...
Страница 189: ...HCEN9094Rev 10 2005 Protective Protective 7 17 Boards 7 1 2 9 6 5 4 3 8 ...
Страница 191: ...HCEN9094Rev 10 2005 1 7 18 Rear box 6 3 7 5 4 2 ...
Страница 193: ...HCEN9094Rev 10 2005 7 19 Protective Covers 3 5 4 2 7 1 6 8 The figures do not correspond to their actual sizes ...
Страница 195: ...HCEN9094Rev 10 2005 T12AH 250AC BACH BACO HALT 7 20 AC DC 2 4 5 1 6 7 8 9 3 ...
Страница 203: ...HCEN9094Rev 10 2005 7 24 Front MM95 18 8 4 8 5 7 20 15 14 6 2 11 21 19 10 9 12 15 3 17 15 13 13 16 14 17 12 1 ...
Страница 205: ...HCEN9094Rev 10 2005 7 25 MM I O board 3 2 9 4 6 7 8 5 1 10 ...
Страница 207: ...HCEN9094Rev 10 2005 7 26 Feeding pumps 15 18 14 16 10 7 10 19 2 6 3 4 17 5 7 12 20 13 9 11 14 18 8 ...
Страница 215: ...HCEN9094Rev 10 2005 7 30 UFD Option 4 5 7 17 12 9 6 18 1 6 11 16 8 10 6 13 14 3 2 6 19 15 ...
Страница 217: ...HCEN9094Rev 10 2005 7 31 Remote panel Option 18 6 7 8 12 7 14 15 16 17 13 11 10 9 5 4 3 2 1 22 23 24 25 26 19 20 21 ...
Страница 219: ...HCEN9094Rev 10 2005 7 32 Boards and Cablings EN1107 10 Step driver board ...
Страница 221: ...HCEN9094Rev 10 2005 7 32 Boards and Cablings EN1107 10 Step driver board ...
Страница 224: ......
Страница 225: ...9 1 HCEN9160 Revision10 2005 Service Manual Symbols Chapter9 SymbolDescription ...
Страница 228: ...9 4 HCEN9160Revision10 2005 Service Manual Symbols Thispageisleftintentionallyblank ...
Страница 229: ...AK 95 AK95SHCEN12078Rev 10 2005 10 1 Replacements Replacements Replacement matrix 2 Changeactions 4 FM Flow Diagram 5 ...
Страница 234: ...Replacements 10 6 AK 95 AK95SHCEN12078Rev 10 2005 This page is intentionally left blank ...
Страница 244: ...11 10 Electrical Safety Inspections for AK machines HCEN12190 Rev 05 2006 This page is intentionally left blank ...
Страница 247: ...AK 95 AK 95 S Service Manual ...