5:13
AK 95 / AK 95 S
HCEN12189 Rev.
10. 2006
Maintenance Manual
Base-kit
37. Simulated treatment
Note!
The following test procedure should
preferably not be started or stopped during a
taration of the UF-system. In this case there
might be a small difference in volume.
Simulate a venous pressure of approx.
50 mm Hg by blocking the pressure port with a
blocked piece of tubing and turning the level
adjustment knob.
Insert the filled venous drip chamber in the air
detector.
Press fluid bypass-button (for bypass mode).
Connect a T-piece to the dialysis tubings. Make
sure that the tubing is long and thin enough to
create a TMP of approx. 200±100 mm Hg during
the simulated treatment.
Press fluid bypass-button (for direct mode).
Put the end of the tube in a measuring glass
placed on the bottom tray.
Note!
The position of the measuring glass will
affect the TMP.
Set the blood pump speed to 100 ml/min and
start the blood pump.
Set minimum UF-rate to 0.0 l/h.
Make sure the measuring glass is filled to 1.00 l
with water of 37.0 °C.
Set a UF-volume of 0.9 l and treatment time of
1:00 h.
Check that the tube to the measuring glass is
filled with water and all air bubbles are evacu-
ated. Let the UF-rate stabilize.
Simulate blood in the priming detector with a
piece of paper.
Make sure (again) that the measuring glass is
filled to 1.00 liter.
Press the UF START/STOP button.
Note!
It is very important to do these things
more or less simultaneously i.e. within seconds.
Check the residual volume at TIME = 0:00.
Approved residual volume: 100 ml +/- 50 ml
Repeat the test if smaller deviations appear.
Note!
All kind of fluid alarms (conductivity etc.)
has to be avoided.
38.
Check that the overload protection on the
heparin pump is working.
39.
Check the arterial clamp by attaching the
calibration tube set into the arterial clamp.
Enter priming mode and create a level
detector alarm to get the clamp closed.
Apply a pressure of 600 mmHg. Check that
the pressure does not fall more than 30
mmHg in 15 seconds.
40.
Check the venous clamp by attaching the
calibration tube set into the venous clamp.
Enter priming mode and create a level
detector alarm, by lowering the level in
the drip chamber, to get the clamp closed.
Apply a pressure of 600 mmHg.
Check that the pressure does not fall more
than 30 mmHg in 15 seconds.
41.
If installed: Check the battery backup by
disconnecting the mains plug. Let the
machine run for at least 1 minute.
Note!
This is not a capacity test of the
backup batteries.
42.
Reconnect the mains plug to the outlet
supply of an electrical safety tester.
Perform the Earth Leakage Test (ELT) and
the Patient Earth Leakage Test (PLT)
according to instructions available in
HCEN12190, Electrical safety inspections
for AK-machines.
43.
Perform heat/chemical disinfection.
Содержание AK 95
Страница 1: ...AK 95 AK 95 S Service Manual A better way to better care ...
Страница 5: ...This page is intentionally left blank ...
Страница 6: ...Installation Guide AK 95 AK 95 S January 2004 ...
Страница 7: ......
Страница 17: ...AK 95 AK 95 S Service Manual HCEN9133Rev 01 2004 1 10 Installation Guide This page is intentionally left blank ...
Страница 19: ...AK 95 AK 95 S Service Manual HCEN9133Rev 01 2004 1 12 Installation Guide This page is intentionally left blank ...
Страница 20: ......
Страница 64: ...Technical Data AK 95 HCEN9135 Rev 10 2005 3 1 Chapter 3 Technical data and specifications for AK 95 ...
Страница 102: ...Maintenance Manual AK 95 AK 95 S October 2006 GAMBRO ...
Страница 103: ......
Страница 125: ...5 22 MaintenanceManual AK95 AK95SHCEN12189Rev 10 2006 This page is intentionally left blank ...
Страница 126: ......
Страница 151: ...AK 95 AK 95 S Service Manual HCEN9138Rev 10 2005 6 24 Calibrations This page is intentionally left blank ...
Страница 152: ...Spare Parts List AK 95 AK 95 S October 2005 ...
Страница 153: ......
Страница 159: ...HCEN9094Rev 10 2005 7 3 Operator s panel 9 1 3 4 5 6 5 7 5 2 8 6 6 8 ...
Страница 161: ...HCEN9094Rev 10 2005 7 4 Blood pump 10 2 8 3 5 9 4 7 1 6 11 12 ...
Страница 163: ...HCEN9094Rev 10 2005 7 5 Blood pump Motor unit 8 7 6 9 2 10 3 4 5 1 11 ...
Страница 165: ...HCEN9094Rev 10 2005 7 6 Heparin pump 1 2 3 4 5 6 8 7 ...
Страница 169: ...HCEN9094Rev 10 2005 7 8 Magnetic Clamp unit 1 2 3 7 8 12 16 4 5 6 9 10 11 17 18 14 13 19 15 ...
Страница 173: ...HCEN9094Rev 10 2005 7 10 UF measuring unit 8 10 14 17 7 11 9 4 13 16 2 15 1 3 6 9 12 18 20 19 21 ...
Страница 181: ...HCEN9094Rev 10 2005 7 13 Heater Flow guard 3 9 1 2 10 4 8 7 11 12 13 5 6 3 ...
Страница 187: ...HCEN9094Rev 10 2005 7 16 Variable flow unit to Step driver board 2 2 4 5 3 1 8 7 4 11 6 9 10 13 14 15 12 ...
Страница 189: ...HCEN9094Rev 10 2005 Protective Protective 7 17 Boards 7 1 2 9 6 5 4 3 8 ...
Страница 191: ...HCEN9094Rev 10 2005 1 7 18 Rear box 6 3 7 5 4 2 ...
Страница 193: ...HCEN9094Rev 10 2005 7 19 Protective Covers 3 5 4 2 7 1 6 8 The figures do not correspond to their actual sizes ...
Страница 195: ...HCEN9094Rev 10 2005 T12AH 250AC BACH BACO HALT 7 20 AC DC 2 4 5 1 6 7 8 9 3 ...
Страница 203: ...HCEN9094Rev 10 2005 7 24 Front MM95 18 8 4 8 5 7 20 15 14 6 2 11 21 19 10 9 12 15 3 17 15 13 13 16 14 17 12 1 ...
Страница 205: ...HCEN9094Rev 10 2005 7 25 MM I O board 3 2 9 4 6 7 8 5 1 10 ...
Страница 207: ...HCEN9094Rev 10 2005 7 26 Feeding pumps 15 18 14 16 10 7 10 19 2 6 3 4 17 5 7 12 20 13 9 11 14 18 8 ...
Страница 215: ...HCEN9094Rev 10 2005 7 30 UFD Option 4 5 7 17 12 9 6 18 1 6 11 16 8 10 6 13 14 3 2 6 19 15 ...
Страница 217: ...HCEN9094Rev 10 2005 7 31 Remote panel Option 18 6 7 8 12 7 14 15 16 17 13 11 10 9 5 4 3 2 1 22 23 24 25 26 19 20 21 ...
Страница 219: ...HCEN9094Rev 10 2005 7 32 Boards and Cablings EN1107 10 Step driver board ...
Страница 221: ...HCEN9094Rev 10 2005 7 32 Boards and Cablings EN1107 10 Step driver board ...
Страница 224: ......
Страница 225: ...9 1 HCEN9160 Revision10 2005 Service Manual Symbols Chapter9 SymbolDescription ...
Страница 228: ...9 4 HCEN9160Revision10 2005 Service Manual Symbols Thispageisleftintentionallyblank ...
Страница 229: ...AK 95 AK95SHCEN12078Rev 10 2005 10 1 Replacements Replacements Replacement matrix 2 Changeactions 4 FM Flow Diagram 5 ...
Страница 234: ...Replacements 10 6 AK 95 AK95SHCEN12078Rev 10 2005 This page is intentionally left blank ...
Страница 244: ...11 10 Electrical Safety Inspections for AK machines HCEN12190 Rev 05 2006 This page is intentionally left blank ...
Страница 247: ...AK 95 AK 95 S Service Manual ...