5:16
Maintenance Manual
AK 95 / AK 95 S
HCEN12189 Rev.10
. 2006
Actions to carry out after the parts have
been exchanged
1.
First perform a heat disinfection program.
Refer to the AK 95 or AK 95 S Operator’s
Manual.
2.
After the heat disinfection; re-tighten the
nuts of the dialyser connector set to the
machine.
3.
Let the machine pass FCH.
4.
Control of the blood pump occlusion
Check surface on the roller at the pump
rotor, if it is damaged exchange the unit.
The roller unit should easily go back to
upper end position when it has been pres-
sed down to end position, exchange unit if
it gets stuck in any position.
Note!
If the blood lines have a different
wall thickness, the occlusion of the blood
pump must be adjusted to the right size.
Use the gauge pins (stop/go) available in
the kit K40158001. The kit includes
following three different gauge pins:
T = 1.1 (Stop pin = 1.1*2*0.7 = 1.5mm)
T = 1.6 (Stop pin = 1.6*2*0.7 = 2.2mm)
T = 2.0 (Stop pin = 2.0*2*0.7 = 2.8mm)
T = wall thickness of the blood tubing
Use following formula to calculate which
gage pin to use:
2 * wall thickness * 0,7 (mm)
A-kit
A
B
A c e ta te
Nuts
Check the range between the blood
pump rollers and the path according to
the picture below.
Adjust range between the blood pump
rollers and the path if it is necessary.
The GO pin should barely pass within
the calibrating area.
The STOP pin is NOT allowed to pass
in any point within the calibrating
area.
Note!
Put grease on the GO and STOP
pins when not used and store gage in
plastic bag to prevent it from corroding.
Note!
The gauge pins can also be
ordered separately:
T=1.1 (white) K40158002
T=1.6 mm (red) K40158003
T=2.0 mm (blue) K40158004
= Measuring
Содержание AK 95
Страница 1: ...AK 95 AK 95 S Service Manual A better way to better care ...
Страница 5: ...This page is intentionally left blank ...
Страница 6: ...Installation Guide AK 95 AK 95 S January 2004 ...
Страница 7: ......
Страница 17: ...AK 95 AK 95 S Service Manual HCEN9133Rev 01 2004 1 10 Installation Guide This page is intentionally left blank ...
Страница 19: ...AK 95 AK 95 S Service Manual HCEN9133Rev 01 2004 1 12 Installation Guide This page is intentionally left blank ...
Страница 20: ......
Страница 64: ...Technical Data AK 95 HCEN9135 Rev 10 2005 3 1 Chapter 3 Technical data and specifications for AK 95 ...
Страница 102: ...Maintenance Manual AK 95 AK 95 S October 2006 GAMBRO ...
Страница 103: ......
Страница 125: ...5 22 MaintenanceManual AK95 AK95SHCEN12189Rev 10 2006 This page is intentionally left blank ...
Страница 126: ......
Страница 151: ...AK 95 AK 95 S Service Manual HCEN9138Rev 10 2005 6 24 Calibrations This page is intentionally left blank ...
Страница 152: ...Spare Parts List AK 95 AK 95 S October 2005 ...
Страница 153: ......
Страница 159: ...HCEN9094Rev 10 2005 7 3 Operator s panel 9 1 3 4 5 6 5 7 5 2 8 6 6 8 ...
Страница 161: ...HCEN9094Rev 10 2005 7 4 Blood pump 10 2 8 3 5 9 4 7 1 6 11 12 ...
Страница 163: ...HCEN9094Rev 10 2005 7 5 Blood pump Motor unit 8 7 6 9 2 10 3 4 5 1 11 ...
Страница 165: ...HCEN9094Rev 10 2005 7 6 Heparin pump 1 2 3 4 5 6 8 7 ...
Страница 169: ...HCEN9094Rev 10 2005 7 8 Magnetic Clamp unit 1 2 3 7 8 12 16 4 5 6 9 10 11 17 18 14 13 19 15 ...
Страница 173: ...HCEN9094Rev 10 2005 7 10 UF measuring unit 8 10 14 17 7 11 9 4 13 16 2 15 1 3 6 9 12 18 20 19 21 ...
Страница 181: ...HCEN9094Rev 10 2005 7 13 Heater Flow guard 3 9 1 2 10 4 8 7 11 12 13 5 6 3 ...
Страница 187: ...HCEN9094Rev 10 2005 7 16 Variable flow unit to Step driver board 2 2 4 5 3 1 8 7 4 11 6 9 10 13 14 15 12 ...
Страница 189: ...HCEN9094Rev 10 2005 Protective Protective 7 17 Boards 7 1 2 9 6 5 4 3 8 ...
Страница 191: ...HCEN9094Rev 10 2005 1 7 18 Rear box 6 3 7 5 4 2 ...
Страница 193: ...HCEN9094Rev 10 2005 7 19 Protective Covers 3 5 4 2 7 1 6 8 The figures do not correspond to their actual sizes ...
Страница 195: ...HCEN9094Rev 10 2005 T12AH 250AC BACH BACO HALT 7 20 AC DC 2 4 5 1 6 7 8 9 3 ...
Страница 203: ...HCEN9094Rev 10 2005 7 24 Front MM95 18 8 4 8 5 7 20 15 14 6 2 11 21 19 10 9 12 15 3 17 15 13 13 16 14 17 12 1 ...
Страница 205: ...HCEN9094Rev 10 2005 7 25 MM I O board 3 2 9 4 6 7 8 5 1 10 ...
Страница 207: ...HCEN9094Rev 10 2005 7 26 Feeding pumps 15 18 14 16 10 7 10 19 2 6 3 4 17 5 7 12 20 13 9 11 14 18 8 ...
Страница 215: ...HCEN9094Rev 10 2005 7 30 UFD Option 4 5 7 17 12 9 6 18 1 6 11 16 8 10 6 13 14 3 2 6 19 15 ...
Страница 217: ...HCEN9094Rev 10 2005 7 31 Remote panel Option 18 6 7 8 12 7 14 15 16 17 13 11 10 9 5 4 3 2 1 22 23 24 25 26 19 20 21 ...
Страница 219: ...HCEN9094Rev 10 2005 7 32 Boards and Cablings EN1107 10 Step driver board ...
Страница 221: ...HCEN9094Rev 10 2005 7 32 Boards and Cablings EN1107 10 Step driver board ...
Страница 224: ......
Страница 225: ...9 1 HCEN9160 Revision10 2005 Service Manual Symbols Chapter9 SymbolDescription ...
Страница 228: ...9 4 HCEN9160Revision10 2005 Service Manual Symbols Thispageisleftintentionallyblank ...
Страница 229: ...AK 95 AK95SHCEN12078Rev 10 2005 10 1 Replacements Replacements Replacement matrix 2 Changeactions 4 FM Flow Diagram 5 ...
Страница 234: ...Replacements 10 6 AK 95 AK95SHCEN12078Rev 10 2005 This page is intentionally left blank ...
Страница 244: ...11 10 Electrical Safety Inspections for AK machines HCEN12190 Rev 05 2006 This page is intentionally left blank ...
Страница 247: ...AK 95 AK 95 S Service Manual ...