5:2
Maintenance Manual
AK 95 / AK 95 S
HCEN12189 Rev.10
. 2006
To ensure proper operation of AK 95 / AK 95 S,
a qualified service technician must perform a
complete series of preventive maintenance
procedures at regular intervals.
The maintenance and calibration information
that you need to use is provided in this manual.
The preventive maintenance procedures have
been devised to require a minimum of time while
ensuring that the machine is maintained in
optimum operation condition.
Included in the preventive maintenance proce-
dures are checks to verify normal machine
operation. Should the machine fail to pass any of
these tests, repair or calibration might be
needed, then repeat the tests until the specifica-
tions are met.
It is mandatory to perform at least a preventive
maintenance every second year.
A yearly maintenance is recommended. The rate
of preventive maintenance might be different
due to variations of the operating environment.
The AK95 / AK 95 S will perform as designed
only if it is used and maintained in accordance
with Gambro’s instructions.
Any warranties made by Gambro with respect to
the AK 95 / AK 95 S are void if the equipment is
not used in accordance with the instructions
provided. Gambro will not accept responsibility
for any damage or injury resulting from im-
proper use or maintenance or unauthorized
repair.
To fulfill the preventive maintenance procedures
for AK 95 / AK 95 S some parts must be ex-
changed. The necessary parts to be exchanged
are available in a Base-kit and three complemen-
tary kits:
•
Base-kit (K40182001)
•
A-kit (K40179001): Includes exterior parts
•
B-kit* (K40180001): Overhauling service-
kit (with separate valve membranes)
•
C-kit* (K40181001): Overhauling service-
kit (with complete 2- and 3-way valves)
Note!
All parts in the A-kit are possible to exchange
without opening the dialysis machine.
* The contents of the B-kit is the same as the
contents of the C-kit with one exception;
the C-kit contains complete 2- and 3-way valve
housings instead of separate valve membranes.
Therefore either select the B-kit or the C-kit.
Select the one that meets your specific need
best.
When performing preventive maintenance
procedures or calibrations, which require access
to the interior of the machine, you must have
proper electrostatic safety devices (i.e. wrist
grounding straps or grounding mats) in place to
prevent damage to electrostatic sensitive compo-
nents within the machine.
During repair of any of the parts in the flow
path, special care should be taken and a good
hygiene should be kept.
Note!
After maintenance a disinfection program
must be performed before a treatment is per-
formed.
Checklists are provided in the Spare Parts
Instruction that is included in the maintenance-
kits. The purpose of these checklists is to record
the work done.
General
Содержание AK 95
Страница 1: ...AK 95 AK 95 S Service Manual A better way to better care ...
Страница 5: ...This page is intentionally left blank ...
Страница 6: ...Installation Guide AK 95 AK 95 S January 2004 ...
Страница 7: ......
Страница 17: ...AK 95 AK 95 S Service Manual HCEN9133Rev 01 2004 1 10 Installation Guide This page is intentionally left blank ...
Страница 19: ...AK 95 AK 95 S Service Manual HCEN9133Rev 01 2004 1 12 Installation Guide This page is intentionally left blank ...
Страница 20: ......
Страница 64: ...Technical Data AK 95 HCEN9135 Rev 10 2005 3 1 Chapter 3 Technical data and specifications for AK 95 ...
Страница 102: ...Maintenance Manual AK 95 AK 95 S October 2006 GAMBRO ...
Страница 103: ......
Страница 125: ...5 22 MaintenanceManual AK95 AK95SHCEN12189Rev 10 2006 This page is intentionally left blank ...
Страница 126: ......
Страница 151: ...AK 95 AK 95 S Service Manual HCEN9138Rev 10 2005 6 24 Calibrations This page is intentionally left blank ...
Страница 152: ...Spare Parts List AK 95 AK 95 S October 2005 ...
Страница 153: ......
Страница 159: ...HCEN9094Rev 10 2005 7 3 Operator s panel 9 1 3 4 5 6 5 7 5 2 8 6 6 8 ...
Страница 161: ...HCEN9094Rev 10 2005 7 4 Blood pump 10 2 8 3 5 9 4 7 1 6 11 12 ...
Страница 163: ...HCEN9094Rev 10 2005 7 5 Blood pump Motor unit 8 7 6 9 2 10 3 4 5 1 11 ...
Страница 165: ...HCEN9094Rev 10 2005 7 6 Heparin pump 1 2 3 4 5 6 8 7 ...
Страница 169: ...HCEN9094Rev 10 2005 7 8 Magnetic Clamp unit 1 2 3 7 8 12 16 4 5 6 9 10 11 17 18 14 13 19 15 ...
Страница 173: ...HCEN9094Rev 10 2005 7 10 UF measuring unit 8 10 14 17 7 11 9 4 13 16 2 15 1 3 6 9 12 18 20 19 21 ...
Страница 181: ...HCEN9094Rev 10 2005 7 13 Heater Flow guard 3 9 1 2 10 4 8 7 11 12 13 5 6 3 ...
Страница 187: ...HCEN9094Rev 10 2005 7 16 Variable flow unit to Step driver board 2 2 4 5 3 1 8 7 4 11 6 9 10 13 14 15 12 ...
Страница 189: ...HCEN9094Rev 10 2005 Protective Protective 7 17 Boards 7 1 2 9 6 5 4 3 8 ...
Страница 191: ...HCEN9094Rev 10 2005 1 7 18 Rear box 6 3 7 5 4 2 ...
Страница 193: ...HCEN9094Rev 10 2005 7 19 Protective Covers 3 5 4 2 7 1 6 8 The figures do not correspond to their actual sizes ...
Страница 195: ...HCEN9094Rev 10 2005 T12AH 250AC BACH BACO HALT 7 20 AC DC 2 4 5 1 6 7 8 9 3 ...
Страница 203: ...HCEN9094Rev 10 2005 7 24 Front MM95 18 8 4 8 5 7 20 15 14 6 2 11 21 19 10 9 12 15 3 17 15 13 13 16 14 17 12 1 ...
Страница 205: ...HCEN9094Rev 10 2005 7 25 MM I O board 3 2 9 4 6 7 8 5 1 10 ...
Страница 207: ...HCEN9094Rev 10 2005 7 26 Feeding pumps 15 18 14 16 10 7 10 19 2 6 3 4 17 5 7 12 20 13 9 11 14 18 8 ...
Страница 215: ...HCEN9094Rev 10 2005 7 30 UFD Option 4 5 7 17 12 9 6 18 1 6 11 16 8 10 6 13 14 3 2 6 19 15 ...
Страница 217: ...HCEN9094Rev 10 2005 7 31 Remote panel Option 18 6 7 8 12 7 14 15 16 17 13 11 10 9 5 4 3 2 1 22 23 24 25 26 19 20 21 ...
Страница 219: ...HCEN9094Rev 10 2005 7 32 Boards and Cablings EN1107 10 Step driver board ...
Страница 221: ...HCEN9094Rev 10 2005 7 32 Boards and Cablings EN1107 10 Step driver board ...
Страница 224: ......
Страница 225: ...9 1 HCEN9160 Revision10 2005 Service Manual Symbols Chapter9 SymbolDescription ...
Страница 228: ...9 4 HCEN9160Revision10 2005 Service Manual Symbols Thispageisleftintentionallyblank ...
Страница 229: ...AK 95 AK95SHCEN12078Rev 10 2005 10 1 Replacements Replacements Replacement matrix 2 Changeactions 4 FM Flow Diagram 5 ...
Страница 234: ...Replacements 10 6 AK 95 AK95SHCEN12078Rev 10 2005 This page is intentionally left blank ...
Страница 244: ...11 10 Electrical Safety Inspections for AK machines HCEN12190 Rev 05 2006 This page is intentionally left blank ...
Страница 247: ...AK 95 AK 95 S Service Manual ...