CENTRIC User Guide, rel. 3.4
67
7.3.2
Operation > TRANSFER LOAD
From this menu you can move the load from the inverter to the bypass voltage, or vice versa.
7.3.2.1
OPERATION > TRANSFER LOAD > TRANSFER LOAD TO INVERTER
Transfers the load from the bypass voltage to the inverter voltage.
7.3.2.2
OPERATION > TRANSFER LOAD > TRANSFER LOAD TO BYPASS
Transfers the load from the inverter voltage to the bypass voltage.
7.3.3
Operation > BATTERY TEST
Only one function under this menu; it executes a battery test. Once the battery test begins you have the
option of aborting the test before it finishes.
Operational parameters for the battery test can be found
in section
7.2.3.1 "Setup > Battery > BATTERY TEST PARAMETERS" on page 30.