RX200 S8
Upgrade and Maintenance Manual
289
System board and components
Ê
"Connecting the server to the mains" on page 57
Ê
"Enabling SVOM boot watchdog functionality" on page 78
Ê
"Switching on the server" on page 58
Ê
"Enabling BitLocker functionality" on page 83
15.3.3.5 Software configuration
The UFM delivery set includes the "Recovery Tool CD" to setup the ESXi
configuration. Proceed as follows:
Ê
Switch on the server.
Ê
Right after switching on the server, insert the "Recovery Tool CD" into the
DVD drive and close the drive tray.
Ê
The server should now boot from the "Recovery Tool CD".
Ê
Follow the on-screen instructions.
15.4 Trusted Platform Module (TPM)
15.4.1 Installing the TPM
15.4.1.1 Preliminary steps
Ê
"Disabling BitLocker functionality" on page 63
Ê
"Shutting down the server" on page 46
Ê
"Disconnecting the server from the mains" on page 47
Field Replaceable Unit
(FRU)
Hardware: 5 minutes
Software: 5 minutes
Tools:
– Bit screw driver
– TPM bit insert
(
*
)
(
*
)
For the Japanese market:
– TPM module fixing tool (S26361-F3552-L909)
Содержание PRIMERGY RX200 S8
Страница 30: ...30 Upgrade and Maintenance Manual RX200 S8 Before you start ...
Страница 42: ...42 Upgrade and Maintenance Manual RX200 S8 Important information ...
Страница 106: ...106 Upgrade and Maintenance Manual RX200 S8 Power supply ...
Страница 130: ...130 Upgrade and Maintenance Manual RX200 S8 Hard disk drives solid state drives ...
Страница 194: ...194 Upgrade and Maintenance Manual RX200 S8 Expansion cards and backup units ...
Страница 210: ...210 Upgrade and Maintenance Manual RX200 S8 Main memory ...
Страница 234: ...234 Upgrade and Maintenance Manual RX200 S8 Processors ...
Страница 244: ...244 Upgrade and Maintenance Manual RX200 S8 Optical disk drive ...
Страница 320: ...320 Upgrade and Maintenance Manual RX200 S8 Cables ...