RX200 S8
Upgrade and Maintenance Manual
229
Processors
Figure 160: Closing socket release lever 1
Ê
Close the socket release lever marked
Open 1st
(1) and latch it under the
load plate retention tab (2).
11.3.5 Applying the thermal paste to the processor
surface
I
– For the Japanese market, the service engineer must follow the
instruction provided separately.
– If the processor replacement kit contains a new heat sink, a thin layer
of thermal compound has already been pre-applied to its lower
surface. In this case, please proceed with section
"Installing the heat
sink" on page 231
.
Содержание PRIMERGY RX200 S8
Страница 30: ...30 Upgrade and Maintenance Manual RX200 S8 Before you start ...
Страница 42: ...42 Upgrade and Maintenance Manual RX200 S8 Important information ...
Страница 106: ...106 Upgrade and Maintenance Manual RX200 S8 Power supply ...
Страница 130: ...130 Upgrade and Maintenance Manual RX200 S8 Hard disk drives solid state drives ...
Страница 194: ...194 Upgrade and Maintenance Manual RX200 S8 Expansion cards and backup units ...
Страница 210: ...210 Upgrade and Maintenance Manual RX200 S8 Main memory ...
Страница 234: ...234 Upgrade and Maintenance Manual RX200 S8 Processors ...
Страница 244: ...244 Upgrade and Maintenance Manual RX200 S8 Optical disk drive ...
Страница 320: ...320 Upgrade and Maintenance Manual RX200 S8 Cables ...