A26361-K863-Z102-8-7619
Rev. 8.0
45
Preparation for Use and Operation
Switching the Server System ON/OFF
Switching ON/OFF the Server Blades
The system must be powered ON.
The server blade can be switched ON and OFF in the following ways:
–
For switching ON the server blade, press the power button of the server
blade (position 1 on figure 37 on page 76).
For switching OFF the server blade, press the power button of the server
blade (position 1 on figure 37 on page 76) for 4 seconds. If the ServerView
agents are installed, a gracefull shutdown is initiated. For hard shutdown,
press the power button for 10 seconds.
–
Specified switch-ON time/switch-OFF time
The server blade is switched ON or OFF at a time specified in the
ServerView
program. The switch-ON/switch-OFF times also can be set via the web
interface of the management blade.
–
After power failure
The server blade automatically switches ON following a power failure
(depending of the settings in the BIOS).
Содержание PRIMERGY BX300
Страница 4: ......
Страница 6: ......
Страница 10: ......
Страница 20: ......
Страница 47: ...A26361 K863 Z102 8 7619 Rev 8 0 37 Installing the Hardware Cabling the System Figure 12 Cable routing ...
Страница 72: ......
Страница 78: ......
Страница 80: ......
Страница 120: ......
Страница 134: ......
Страница 142: ......
Страница 150: ......
Страница 158: ......
Страница 160: ......
Страница 162: ......