104
Rev. 8.0
A26361-K863-Z102-8-7619
Control and Connection Panel
The Switch Blade
If more than 10 server blades are to be integrated in the system, the even-
numbered slots 2 and 4 will be used, and a third or forth switch blade must be
installed in these slots.
For corresponding server blade/switch blade LAN mapping see table 2 on
page 66.
Figure 66: Switch blade locations
9.1
Control and Connection Panel
The connection panel of the switch blade can be accessed from the rear of the
system under the rear fan module (figure 67).
Figure 67: Switch Blade control and connection panel
Содержание PRIMERGY BX300
Страница 4: ......
Страница 6: ......
Страница 10: ......
Страница 20: ......
Страница 47: ...A26361 K863 Z102 8 7619 Rev 8 0 37 Installing the Hardware Cabling the System Figure 12 Cable routing ...
Страница 72: ......
Страница 78: ......
Страница 80: ......
Страница 120: ......
Страница 134: ......
Страница 142: ......
Страница 150: ......
Страница 158: ......
Страница 160: ......
Страница 162: ......