Page 19
§ 3.3.
Z-Axis Unit Assembly
§ 3.3.1.
Z-Axis Unit Assembly
Z-Axis-Unit consists of two elements, Z-Clamp-Unit and Z-Motor-Unit.
§ 3.3.1.1
Sheath Clamp Top
1.
Refer to Fig. 3.3.1.
2.
Insert Super-Shaft (h7-1518) through Sheath- Clamp
•
and Hinge
‚
.
3.
Insert Fiber-Pusher-Spring
†
between Fiber-Pusher
ƒ
and Sheath Clamp
•
.
4.
Press Fiber-Pusher
ƒ
into Sheath Clamp
•
, install Magnet-Catcher (Front)
„
and Magnet-Catcher
(Rear)
…
with each two phillips-head screws (M2×4, T=3). Note – Front and rear Magnet Catcher
are not interchangeable. Insure that Fiber-Pusher
ƒ
moves smoothly after installation.
Phillips-head screw M2×4
(T=3)
Magnet-Catcher(Front)
„
(S1330M-04-05)
Magnet-Catcher(Rear)
…
(S1330M-04-05)
Fiber-Pusher
ƒ
(S1330R-24)
Hinge
‚
Sheath Clamp Spring
†
(S1330M-04-07)
Sheath Clamp
•
(S1330R-22)
Super-Shaft h7-1518
Fig. 3.3.1
Содержание FSM-40S
Страница 53: ...Page 53 5 Electrical 5 1 PCB Connection ...