Page 25
§ 4.2.
Installing Z-Unit
1.
Refer to Fig. 4.2.1 for steps 2~3.
2.
Loosely Attached Z-Motor Unit to Base Frame with Cap screw M3×10
3.
Apply pressure by pushing Z-Motor forward. Tighten Cap screw (M3×10, T=10, WS3, SLG).
Fig. 4.2.1
4.
Refer to Fig. 4.2.2. Place Liner (t=0.7) between Z-Unit and Frame-Base. Note – A small amount of
Silicon-Grease may be applied to Liners to help maintain their position during installation.
5.
Refer to Fig. 4.2.3. Apply pressure by Pushing Z-unit against Frame-Base center and back.
6.
Tighten Cap screw (M3×10, T=10, WS3).
Liner(t=0.7)
(S1330M-04-18)
Cap screw M3×10
(T=10,WS3)
Pushing
Fig. 4.2.2
Fig. 4.2.3
Pushing
Содержание FSM-40S
Страница 53: ...Page 53 5 Electrical 5 1 PCB Connection ...