![FujiClean CE Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/fujiclean/ce/ce_installation-manual_2342241024.webp)
24
Step 1: Excavation
Prepare excavation to be FujiClean
treatment system dimensions as
listed on page 9 and concrete slab
dimensions on page 29.
1
2
Step 2: Compact stone base
Installation Procedure for H-20, HS-20
Using the Poured Top Slab Technique
Note: This technique is only acceptable for larger FujiClean models (CE14 to CE30 and CEN14 to
CEN21).
Unloading Instructions:
Upon delivery, inspect FujiClean Treatment System, both outside and inside for possible damage
incurred during transport. If you find damage, or have a question, please contact your distributor
immediately.
Required Preconditions for this Installation Technique:
Seasonal high groundwater depth must be less than 3 feet 3 inches (1000mm).
Total height from ground level to tank adapter ring should be 24 inches.
Bearing power of soil must be 8.7 PSI or greater.
Important Notes:
Total height from final grade to tank adapter ring should be no greater than 24 inches.
Make sure excavation of slope has a 2:1 as a zone of influence. Install a landslide protection
wall in unstable soil conditions.
FOR CE14-30, CEN14-21
Содержание CE
Страница 37: ...37 Step 14 continued Rebar arrangement details ...
Страница 42: ...42 M Control Panel Wiring Diagram p 2 ...
Страница 45: ... A Control Panel Wiring Diagram p 2 45 ...