No-traffic Area Installation Procedure
Step 1: Prepare excavation to be at least 1 to 2 feet
larger than the tank dimensions as listed in the Design
Specification Table on page 9 of this Manual. Important
Note: Total height from tank top to final grade should
not exceed 24”.
Step 2. Prepare 4”- 6” bed of stone (1/8”), compact
sand, poured or precast concrete level to within 1/8”
per 2 feet. (10mm per 2 meters or 1/200).
Unloading Instructions:
Upon delivery, inspect FujiClean Treatment System, both outside and inside for possible
damage incurred during transport. If you find damage, or have a question, please contact
your distributor immediately.
12
Compact stone or sand
Use ALL 4-point lifting lugs
Step 3: Carefully lower and set tank.
Level to within 1/8” per 2 feet.
(10mm per 2 meters or 1/200), both
fore and aft as well as side to side.