7. Set Recirculation Control Valve (gray), and Recirculation Flow Rate.
•
The recirculation valve should be set according to the table in tank (3
rd
Chamber Label).
•
Normal recirculation flow should be level with the top edge of the recirculation pipe line
cut-out spilling into Chamber 1.
8. Check/Set Aeration Balance Control Valve (blue).
•
The default, normal setting for the Aeration Control Valve is 50%.
•
Visually observe the airflow rates on each side of the plant by checking to see if bubbles
are evenly distributed on both sides of Chamber 3, the Aeration Chamber. If there is an
obvious discrepancy in airflow between the two sides, adjust the Aeration Balance Control
Valve so that the airflow is equal.
Important!
9. Check/Set Effluent Airlift Valve (white).
•
The Effluent Control Valve is initially set to its default setting (as highlighted in black) and
there is typically no need for it to be adjusted under standard operating conditions.
•
Check the observation port in the airlift line to see if there is smooth water flow from the
effluent airlift pump when effluent control valve is turned up.
48
Recirculation Pipe
Indication Line
Water level should
be at top of
horizontal edge.
Содержание CE
Страница 37: ...37 Step 14 continued Rebar arrangement details ...
Страница 42: ...42 M Control Panel Wiring Diagram p 2 ...
Страница 45: ... A Control Panel Wiring Diagram p 2 45 ...