34
Step 7 continued: Install inlet and outlet pipes. 5”: 4” eccentric reducer adapters are provided by
Fuji Clean USA if required. More details on page 15.
Step 9: Locating and Installing Air Pump/Control Panel.
Please refer to instructions on page 17-18.
Step 8: Connect 3/4” or 1” air line conduit. Please refer to table on page 16 for air line
conduit sizing. Please refer page 17 for air pump location detail.
For connection air line to tank, use approved sealant to
prevent septic gas transmission into control panel.
3/4” or 1”
PVC conduit
Step 8 continued: Set riser on the tank. Maximum riser height is 24-inches.
Содержание CE
Страница 37: ...37 Step 14 continued Rebar arrangement details ...
Страница 42: ...42 M Control Panel Wiring Diagram p 2 ...
Страница 45: ... A Control Panel Wiring Diagram p 2 45 ...