Construction Hoist Fraco SEH Premium Range
Assembly and Operating Manual
Page 30 of 69
doc no. 98030718-01
7.2 Assembling the base unit
NOTE
As long as the base unit is not connected to the main voltage, the vertical sliding gates (en-
closure and car) can only be opened manually.
The machine may only be installed and used vertically! The base unit must be aligned at
right-angles to the building or the scaffolding.
Place the base unit at the support points on load distributing and even base supports.
(Note load capacity of the ground, see section 5.1)
Align the base unit according to the specification in section 4.
For more specific instruction how to install the enclosure, see the "Installation instruction
manual".
1 = Base enclosure
2 = Wall panels
3 = Base frame extension
parts
4 = Base frame
5 = Buffer
6 = Ground Control Box
7 = Door enclosure
Fig. 20 Enclosure