Construction Hoist Fraco SEH Premium Range
Assembly and Operating Manual
Page 2 of 69
doc no. 98030718-01
Table of Contents:
Section
Page
1
PREFACE ................................................................................................................................................... 4
2
SAFETY ...................................................................................................................................................... 5
2.1
Explanations of symbols and notes ..................................................................................................... 5
2.1.1
Health and safety symbol ..................................................................................................................................... 5
2.1.2
Attention note ....................................................................................................................................................... 5
2.1.3
Note ...................................................................................................................................................................... 5
2.2
General safety .................................................................................................................................... 5
2.3
Operating safety ................................................................................................................................. 6
2.3.1
Inspection procedures .......................................................................................................................................... 7
2.3.2
Safety notes for assembly, operation and transport ............................................................................................ 7
2.3.3
Safety instructions for maintenance ..................................................................................................................... 7
2.4
Promoting use of operating manuals .................................................................................................. 7
2.5
Employees must be informed about the following: .............................................................................. 8
3
INTENDED USE AND AREA OF APPLICATION ....................................................................................... 9
3.1
The following belongs to intended use, ............................................................................................. 10
3.2
Consequences of non-intended use of the equipment ...................................................................... 10
3.3
Requirements of assembly personnel ............................................................................................... 10
3.4
Operating personnel ......................................................................................................................... 10
4
TECHNICAL DATA ................................................................................................................................... 11
4.1
General data ..................................................................................................................................... 11
4.2
Data depending on model ................................................................................................................. 12
4.3
Options available .............................................................................................................................. 12
4.4
General dimensions .......................................................................................................................... 13
4.5
Mast tie forces .................................................................................................................................. 15
4.5.1
Mast tie forces for a car ...................................................................................................................................... 15
4.6
Summary of the plates and notices ................................................................................................... 16
4.7
Equipment ........................................................................................................................................ 18
4.7.1
Fraco SEH Single ............................................................................................................................................... 18
4.7.2
Fraco SEH - twin ................................................................................................................................................ 19
4.7.3
Electrical switch boxes and drives ..................................................................................................................... 21
4.7.4
Ground box AL0 ................................................................................................................................................. 22
4.7.5
Installation remote control .................................................................................................................................. 22
4.7.6
Drop test remote control ..................................................................................................................................... 23
4.8
Sliding gate ....................................................................................................................................... 23
4.8.1
Toolbox Inside the car ........................................................................................................................................ 24
4.8.2
Car lighting ......................................................................................................................................................... 24
4.8.3
Roof Hatch .......................................................................................................................................................... 24
4.8.4
Self erecting device ............................................................................................................................................ 24
5
REQUIREMENTS FOR THE SITE OF INSTALLATION ........................................................................... 25
5.1
Foundation requirements .................................................................................................................. 25
5.2
Point load (Imperial table) ................................................................................................................. 25
5.3
Point load (Metric table) .................................................................................................................... 26
5.4
Electrical connection (on site) ........................................................................................................... 27
6
TRANSPORT ............................................................................................................................................ 28
6.1
Inspection on receiving the hoist ....................................................................................................... 28
6.2
Loading and unloading the machine ................................................................................................. 28
6.2.1
Lifting with a forklift truck .................................................................................................................................... 28
6.2.2
Lifting with a crane ............................................................................................................................................. 28
7
INSTALLATION ........................................................................................................................................ 29
7.1
Safety notes ...................................................................................................................................... 29
7.2
Assembling the base unit .................................................................................................................. 30
7.3
Extending the mast sections and mast tie to the building .................................................................. 31
7.3.1
Assembling the mast sections up to approx. 30 ft (9 m) high ........................................................................... 31
7.3.2
Assembling the mast .......................................................................................................................................... 32
7.4
Mast tie ............................................................................................................................................. 32
7.5
Cable Guide system ......................................................................................................................... 33
7.6
Assembly of mast sections above 30ft (9 m) ..................................................................................... 34
7.7
Top limit switch cam ......................................................................................................................... 35