ZIPThaw™ 202 System User Manual
Fremon Scientific, Inc.
5726 La Jolla Blvd., Suite 304, La Jolla, CA 92037USA
P
age 13 of 43
FDA
CLEARED
ZipThaw
™
20 2 System
User Manual
•
To ensure complete isolation of the device from the power main source, the
cord’s
mains plug must be
removed from the power mains socket.
•
With the exception of changing the Heating Cushions, do not attempt to repair the device by yourself.
Repairs and modifications may only be carried out by Fremon Scientific or authorized customer personnel.
•
The influence of strong magnetic fields can cause malfunctions in the ZIPThaw
TM
. If electromagnetic
interference occurs, increase the distance between the ZIPThaw
TM
and the device causing the
interference. The ZIPThaw
TM
works within the limit values set in the EN 60601-1-2 standard, and can be
influenced outside these limit values.
•
Portable and mobile HF communication equipment can affect the device.
•
Do not use the device near:
o
Flammable materials
o
Flammable mixtures of anesthetic substances with air, oxygen or nitrous oxide whose flashpoint is
below 50 °C (122 °F).
7 OPERATION
7.1 DEVICE PLACEMENT AND POWER CONNECTION.
▪
Ensure there is enough space for the ZipThaw
TM
202 to be placed on the bench or cart.
▪
Leave at least 10cm (4”) between the rear side of the ZipThaw
TM
202 and a wall to allow easy access to
power ON/OFF main switch located as part of the IEC socket.
▪
Leave clear at least 40cm (15.7”) from each side to allow loading and unloading of bags into/
from the
chambers.
▪
Connect the power cable to the ZipThaw
TM
202 IEC socket, located at the back and plug the cord into a
power outlet.
▪
Always use the power cord supplied by FreMon Scientific to connect to the main power source.
7.2 DOORS STATUS
During the system-operations if any Chamber door is opened or unproperly locked, the following error message
will be displayed:
FIGURE 6. DOOR OPEN ERROR POP-UP SCREEN
Close Chamber Door and Press “OK” will clear the message
.
7.3 POWER UP
Press the power switch at the back of the device to "
ON
" position to provide power to the system. (see
The system goes through self-diagnostics and setup cycles (pre-heating) that may take up to 3 minutes.