molbox™ RFM™ OPERATION AND MAINTENANCE MANUAL
© 1998-2007 DH Instruments, a Fluke Company
Page 20
2.4.5
CHECK/SET SECURITY LEVEL
molbox RFM has a security system based on user levels. By default, the security system is
set to “low”, which includes certain access restrictions, and there is no password required to
change the security level (see Sections 3.6.2). As part of the molbox RFM startup, set your
desired security level and a password.
molbox RFM is delivered with the security level set at low to avoid inadvertent altering of
critical internal settings but with access to changing security levels unrestricted. It is
recommended that the low security level be maintained at all times and password
protection be implemented if control over setting of security levels is desired.
2.5
ADDITIONAL PRECAUTIONS TO TAKE BEFORE MAKING
FLOW MEASUREMENTS
Before using molbox RFM to make meaningful flow measurements, consider the following:
•
Be sure that the gas pressure connected to the molbloc is not great enough to overpressure the
molbox RFM internal RPTs.
•
For molbloc-L operation, the pressure measuring RPTs should be
tared
at the operating line pressure
(see Section 3.4.4.1).
•
Operating pressure should be within the limits of the molbloc calibration type (see Sections 1.2.4.1.2.
and 1.2.4.2.2).
•
The gas type selected should be the gas flowing through the molbloc (see Section 3.4.2).
•
For best accuracy, the gas type should be a gas with which molbloc has been calibrated. See the
molbloc Calibration Report or press
[SETUP]
,
<4molbloc>
,
[ENTER]
to see if the gas is included in
the molbloc calibration gas list (see Section 3.5.4).
•
Do not supply a gas or connect a device under test upstream of the molbloc that may contaminate
the molbloc.
•
Be sure the flow unit of measure you are using is correct. Many different types of flow units of
measure are commonly used. Before selecting a unit of measure, familiarize yourself with Section
3.4.3 thoroughly.
•
Troubleshooting: For information on typically encountered start-up and operational issues, see
Section 6.
2.6
SHORT TERM STORAGE
The following is recommended for short term storage of molbox RFM:
•
Vent the molbox RFM pressure ports.
•
Disconnect the power supply.
When molbox RFM will NOT be used for some time, it may be left powered. Use the SOFT ON/OFF key
to turn OFF the display.
Содержание molbox RFM
Страница 10: ...molbox RFM OPERATION AND MAINTENANCE MANUAL 1998 2007 DH Instruments a Fluke Company Page VIII N NO OT TE ES S ...
Страница 142: ...molbox RFM OPERATION AND MAINTENANCE MANUAL 1998 2007 DH Instruments a Fluke Company Page 132 N NO OT TE ES S ...
Страница 158: ...molbox RFM OPERATION AND MAINTENANCE MANUAL 1998 2007 DH Instruments a Fluke Company Page 148 N NO OT TE ES S ...
Страница 164: ...molbox RFM OPERATION AND MAINTENANCE MANUAL 1998 2007 DH Instruments a Fluke Company Page 154 N NO OT TE ES S ...
Страница 170: ...molbox RFM OPERATION AND MAINTENANCE MANUAL 1998 2007 DH Instruments a Fluke Company Page 160 N NO OT TE ES S ...