iii
List of Tables
Table Title
Page
1.
Shape Marker Periods ............................................................................................ 17
2.
Overlapped and Coupled Commands..................................................................... 19
3.
Voltage Function Verification: AC Voltage into a 1 M
Ω
ohm Load..................... 20
4.
Voltage Function Verification: AC Voltage into a 50
Ω
Load .............................. 21
5.
Voltage Function Verification: DC Voltage into a 50
Ω
Load .............................. 22
6.
Voltage Function Verification: DC Voltage into a 1 M
Ω
Load............................. 22
7.
Edge Function Verification .................................................................................... 23
8.
Leveled Sine Wave Function Verification: Amplitude.......................................... 23
9.
Leveled Sine Wave Function Verification: Flatness.............................................. 24
10.
Leveled Sine Wave Function Verification: Frequency .......................................... 27
11.
Marker Generator Function Verification................................................................ 27
riešenia na presné meranie
http://www.elso.sk