![FLENDER K.A Series Скачать руководство пользователя страница 83](http://html1.mh-extra.com/html/flender/k-a-series/k-a-series_operating-instructions-manual_2303810083.webp)
Commissioning
6
6.1
Measures to be taken prior to commissioning
Take the following measures before commissioning the gear unit:
● Read and observe the operating instructions.
● Replace the screw plug with the air filter or the wet-air filter. Read operating instructions BA
7300 for further information.
● Gear units with backstop: Observe the appropriate measures prior to commissioning gear
units equipped with backstop.
● Fill the gear unit with oil.
● Gear unit with oil supply system: Check that the oil supply system is working properly.
● Check the oil level.
● Check the gear unit for leaks.
● Gear unit with oil supply system: Observe the appropriate measures prior to commissioning
gear units equipped with oil supply system.
● Ensure that all pipes and components are filled with oil.
Further information
Further information about oil and replacement of air filters can be found in the operating
instructions BA 7300 in the complete documentation for the gear unit.
Further information about individual components can be found in the operating instructions for
the components in the complete documentation for the gear unit.
6.1.1
Gear units with cooling coil
Implement the following measures before commissioning the gear unit with cooling coil:
● Check that connecting pipes are firmly seated and tight.
● Open wide the shutoff valves in the coolant inflow and outflow lines of the coolant system.
● Make sure that the pressure in the cooling coil does not exceed the maximum permissible
pressure.
● Make sure that the temperature of the cooling coil does not exceed the maximum
permissible temperature.
Further information
Further information about the cooling coil can be found in the separate data sheet and the list
of equipment in the complete documentation for the gear unit.
REDUREX Gear unit 5200en
Operating Instructions 03/2019
83
Содержание K.A Series
Страница 2: ...07 03 2019 13 01 V4 00...
Страница 10: ...Table of contents REDUREX Gear unit 5200en 10 Operating Instructions 03 2019...
Страница 44: ...Description 3 16 Auxiliary drive REDUREX Gear unit 5200en 44 Operating Instructions 03 2019...
Страница 82: ...Mounting 5 9 Final work REDUREX Gear unit 5200en 82 Operating Instructions 03 2019...
Страница 104: ...Maintenance 8 4 Possible faults REDUREX Gear unit 5200en 104 Operating Instructions 03 2019...
Страница 106: ...Service Support REDUREX Gear unit 5200en 106 Operating Instructions 03 2019...
Страница 108: ...Disposal REDUREX Gear unit 5200en 108 Operating Instructions 03 2019...
Страница 110: ...Spare parts REDUREX Gear unit 5200en 110 Operating Instructions 03 2019...
Страница 112: ...Quality documents A 1 Declaration of incorporation REDUREX Gear unit 5200en 112 Operating Instructions 03 2019...
Страница 122: ...Technical data B 5 Enveloping surface sound pressure level REDUREX Gear unit 5200en 122 Operating Instructions 03 2019...
Страница 126: ...Index REDUREX Gear unit 5200en 126 Operating Instructions 03 2019...
Страница 127: ......