33
19. Remove the Syrup Line Manifold, Manifold
cap, the Duckbill Check Valve, and Coupler
Body from the sanitizer solution and place
on a sanitary tray to air dry. (See
Figure 59.)
Figure 59
20. Install the Duckbill Check Valve into the
Syrup Line Manifold and the Syrup Line
Manifold into the Coupler Body. (See
Figure 60.)
Figure 60
21. Remove the end of the 9-Tube Assembly
from the container. Using a spray bottle of
approved sanitizer solution, spray end of the
assembly and allow it to sanitize for at least
1 minute. (See Figure 61.)
Figure 61
22. Carefully align the pins of the Syrup Line
Manifold with the Syrup Line Connector and
insert the end of the 9-Tube Assembly fully
into the Coupler. (See Figure 62.)
Figure 62
23. Push the Coupler Nut into the Coupler Body
and rotate the Coupler Body until motion
stops to secure. (See Figure 63.)
Figure 63
24. Replace the cap and hang the Assembly
onto the Accessory Hanging Bracket. (See
Figure 64.)
26186
Figure 64
Содержание FB 80Sa-08
Страница 5: ...4 General System Overview 26000 2 1 3 5 7 9 10 11 8 6 4 12 Figure 1...
Страница 11: ...10 Syrup Pump and Related Parts 6 7 5 8 9 10 4 3 26004 1 1D 1C 1A 1E 1B 2 2B 2A 2D 2C Figure 4...
Страница 15: ...14 Electronic Parts and Connections 26006 4A 4 4B 4C 1 2 5 7 7 9 13 9 7 10 16 15 11 7 6 12 14 8 3 9 Figure 6...
Страница 18: ...17...
Страница 22: ...21...
Страница 30: ...29...
Страница 58: ...57...
Страница 72: ...71...