![Fischer Panda 15 mini PMS Digital Скачать руководство пользователя страница 98](http://html1.mh-extra.com/html/fischer-panda/15-mini-pms-digital/15-mini-pms-digital_manual_2294276098.webp)
Maintenance Instructions
Seite/Page 98 - Kapitel/Chapter 7: Maintenance Instructions
12.8.20
have been removed, the capacitors must be discharged
by bridging the capacitor terminals with a discharge
reactor.
The capacitors can be checked using a multimeter with capacitor measuring.
The capacitors fitted inside the cabinet are discharged over the soldered resistor at every capacitor. The discharge
over the discharge reactor (see special tools) is security because the capacitor voltage is lethal.
Fig. 7.12-1: Discharge capacitor single phase
Discharge the capacitor - single phase
01. Discharge reactor (5-10 kOhm)
02. Multimeter
03. Capacitor
Fig. 7.12-2: Discharge capacitor three phase
Discharge the capacitor - three phase
01. Discharge reactor (5-10 kOhm)
02. Multimeter
03. Capacitor
At three phase capacitors the discharge must be made
between every phase (L1-L2; L2-L3; L1-L3)
Fig. 7.12-3: Capacitor checking
Checking
Switch the multimeter to capacitor measuring and connect
the meter end probes to the capacitor terminals. Measure
capacity of the capacitor.
Check all capacitors in the electrical cabinet
Test each capacitor by touching the multimeter (set on capacitor measuring) probes on the capacitor terminals:
measure the capacity of the capacitors.
03
02
01
03
02
01
Содержание 15 mini PMS Digital
Страница 8: ...Seite Page 8 Kapitel Chapter 1 12 8 20 Leere Seite Intentionally blank...
Страница 46: ...Seite Page 46 Kapitel Chapter 4 The Panda Generator 12 8 20 Leere Seite Intentionally blank The Panda Generator...
Страница 116: ...Seite Page 116 Kapitel Chapter 8 Generator Faults 12 8 20 Leere Seite Intentionally blank Generator Faults...