4.3 Instructions for operation
CAUTION
In order to avoid damge due to uncushioned
movement into the end position:
•
Always carry out commissioning again after
adjusting th fixed stops or when components and
tubing have been replaced.
•
Observe the permitted mass load.
PLEASE NOTE
In order to avoid undesired movements of the actua-
tors, always proceed as follows:
Switching on
•
Always switch on first the operating voltage supply
and then the compressed air supply.
Switching off
•
Switch off the operating voltage supply and the com-
pressed air supply at the same time or in the follow-
ing sequence:
1. compressed air supply
2. operating voltage supply.
4. Commissioning
4-8
SPC-10 9902a
Содержание SPC-10 Series
Страница 1: ...Smart Soft Stop SPC 10 Electronic Pneumatic ...
Страница 3: ...Order no 170 363 Title Manual Designation P BE SPC10 GB II SPC 10 9902a ...
Страница 9: ...VIII SPC 10 9902a ...
Страница 10: ...Chapter 1 Summary of system 1 Summary of system SPC 10 9902a 1 1 ...
Страница 18: ...Chapter 2 Fitting 2 Fitting SPC 10 9902a 2 1 ...
Страница 19: ...Contents 2 Fitting 2 1 Fitting the SPC 10 2 3 2 Fitting 2 2 SPC 10 9902a ...
Страница 22: ...Chapter 3 Installation 3 Installation SPC 10 9902a 3 1 ...
Страница 52: ...Chapter 4 Commissioning 4 Commissioning SPC 10 9902a 4 1 ...
Страница 62: ...Chapter 5 Diagnosis and error treatment 5 Diagnosis and error treatment SPC 10 9902a 5 1 ...
Страница 74: ...Appendix A Technical appendix Technical appendix SPC 10 9902a A 1 ...
Страница 109: ...Technical appendix A 36 SPC 10 9902a ...
Страница 115: ...Technical appendix A 42 SPC 10 9902a ...