7. Tighten the screws of the tie rod in two stages as
follows:
Stage
CPA10
CPA14
1
0.5 Nm
0.5 Nm
2
1.5 Nm
2 Nm
8. In the case of sub-bases with dismantled compo-
nents, check that the seals are seated correctly on
the sub-base. They must lie properly within the ap-
propriate grooves.
9. Place the removed components on the sub-bases
again and tighten them slightly.
10.Tighten the fastening screws of all components on
the sub-bases again with
- CPA10: 0.2 Nm (+ 0.05 Nm)
- CPA14: 0.3 NM (+ 0.1 Nm)
11.Place the pin-type inserts in the sub-bases (see
chapter 3 "Installation," section "Connecting the
supply, exhaust and work lines").
12.Fit the CPA valve terminals onto their mounting sur-
face (see chapter 2 "Fitting," section "Fitting onto a
wall" or "Fitting with a hat rail").
13.Finally, complete the pneumatic and electrical con-
nections (see chapter 3 "Installation," section "Con-
necting the CPA valve terminal").
5. Maintenance and conversion
5-16
CPA... 9808A
Содержание CPA VI Series
Страница 2: ......
Страница 4: ...Order no 173 515 Title MANUAL Designation P BE CPA GB II CPA 9808A...
Страница 15: ...Chapter 1 System summary 1 System summary CPA 9808A 1 1...
Страница 29: ...Chapter 2 Fitting 2 Fitting CPA 9808A 2 1...
Страница 35: ...Kapitel 3 Installation 3 Installation CPA 9808A 3 1...
Страница 54: ...3 Installation 3 20 CPA 9808A...
Страница 55: ...Chapter 4 Commissioning 4 Commissioning CPA 9808A 4 1...
Страница 69: ...Chapter 5 Maintenance and conversion 5 Maintenance and conversion CPA 9808A 5 1...
Страница 97: ...Technical appendix A Technical appendix CPA 9805NH A 1...