4.1 Commissioning and testing the valves
Proceed as follows when commissioning the CPA valve
terminal:
Commissioning variant
Activity
Preliminary test of pneumatic
tubing
Check the valve-cylinder
combination by means of
manual override
Full commissioning of complete
system
Install and connect the complete
system. Program control by
PLC/industrial PC.
Commissioning of the pneumatic components by
means of manual override is described overleaf.
Commissioning of the CP system is described in the
relevant manual for the CP node.
4. Commissioning
CPA... 9808A
4-3
Содержание CPA VI Series
Страница 2: ......
Страница 4: ...Order no 173 515 Title MANUAL Designation P BE CPA GB II CPA 9808A...
Страница 15: ...Chapter 1 System summary 1 System summary CPA 9808A 1 1...
Страница 29: ...Chapter 2 Fitting 2 Fitting CPA 9808A 2 1...
Страница 35: ...Kapitel 3 Installation 3 Installation CPA 9808A 3 1...
Страница 54: ...3 Installation 3 20 CPA 9808A...
Страница 55: ...Chapter 4 Commissioning 4 Commissioning CPA 9808A 4 1...
Страница 69: ...Chapter 5 Maintenance and conversion 5 Maintenance and conversion CPA 9808A 5 1...
Страница 97: ...Technical appendix A Technical appendix CPA 9805NH A 1...